Installation and Maintenance
EHU-600 Series Humidifiers
3
Pre-Installation
1.
Check Shipment
A claim should be filed with the transportation company (and reported
to Armstrong) if any items are missing or damaged. Your shipment
may consist of as many as four cartons which contain:
a.
Humidifier
b.
Steam generator(s) (two cartons on Model EHU-602)
c.
Steam dispersion tube, Fan Package or HumidiPack
Dispersion Panel.
All controls (control humidistat, high limit stat, etc.) if ordered, are shipped
in a marked package inside the humidifier.
2.
Check Local Codes
EHU-600 Series humidifiers should be installed in accordance with
all applicable building, plumbing, and electrical codes.
3.
Site Selection (See Fig. 3-1)
Electronic steam humidifiers should be installed in locations that
allow routine inspection and accessibility for maintenance opera-
tions. Armstrong recommends that electronic steam humidifiers
not be placed in false ceilings or in locations where unusual
instances of malfunction of the humidifier or the system might cause
damage to non-repairable, unreplaceable, or priceless property.
Note: Please contact factory for duct applications offering high static pressure (>4" WC).
Figure 3-1: Site Selection - General Installation Concept
Close to Main
Power Disconnect
Valved
Water Supply
Dispersion Tube
Separate Cabinet Drain
with Water Seal EHU-600 & 602 Only
Pitch Drain Piping 1”/12”
on Horizontal Runs
Duct
Steam Piping, 1”/12”
Pitch Piping Back