background image

Installation and Maintenance

EHU-600 Series Humidifiers

27

Figure 27-1: Three Phase Tank

with Barriers Installed

Figure 27-2: Single Phase Electrode

Installation Models EHU-601 and 602

Figure 27-3: Electrode Installation

Model EHU-600

Chart 27:1

Approx.

Position

Spacing

Voltage / Condition

#3 with

380-600 Volts / high

barriers

1

1

/

4

"

conductivity water

208-240 Volts / high

#3

1

1

/

4

"

conductivity water

208-240 volts / medium

#2

1"

conductivity water

208-240 Volts / low

#1

3

/

4

"

conductivity water

d.

Put a stainless steel lockwasher and nut on each stud and
tighten all nuts. (A 7/16" socket on a 6" or longer extensions
makes this easier and safer!)

e.

Check the spacings between the electrodes and make sure
they are equal (3 places). Bend the electrodes by hand to
adjust spacings.

f.

When reinstalling push pin connector, make sure they are tight.
See Figure 6-3 and 6-4.

NOTE:

 If barriers are used, electrodes must be in #3 position.

Models EHU-601 and EHU-602 – Single Phase

a.

Clean the inside of the steam generator thoroughly and rinse
with clear water.

b.

Set the jumper strip in place first (see Figure 27-2). Then set
the outer electrode in place and install a stainless steel
lockwasher and nut on the three outer studs, install the pan
head screw as shown. Tighten the nuts and screw. (A 7/16"
socket on an extension makes this step, and the next, much
easier and safer!)

c.

Set the two flat washers in place as shown. Then set the
inner electrode in place and put a lockwasher and nut on each
of the inner studs. Tighten all nuts.
CAUTION: To ensure proper and safe operation, all parts must
be assembled exactly as shown. Use the high water probe as
a location reference.

d.

When reinstalling push pin connector, make sure they are tight.
See Figure 6-3 and 6-4.

Model EHU-600 – Three Phase

a.

Clean the inside of the steam generator thoroughly and rinse
with clear water.

b.

High voltage units are supplied with a barrier/drain screen
assembly in the lower tank half to reduce the possibility of arcing
and increase electrode life. Inspect the barrier/drain screen
assembly and replace if necessary.

c.

Place a flat washer and O-ring on each 1/4" electrode stud
(see Figure 27-3).

d.

The other mounting hole on each electrode is attached to the
tank top with the slotted self-tapping screws. (See Figure 28-1)

e.

From the outside, install a flat washer and 1/4" hex nut on each
electrode stud (see Figure 27-3). Tighten these so they are snug.

f.

See Section 5 of Installation Procedure (Page 6) for information
on installing steam generator in unit.

Lock washer

& Nut (8 places)

Outer

electrode

Inner

electrode

Jumper

Strip

Panhead
Screw

High Water
Probe

Flat
Washers

Washer

Hexnut

O-Ring

Washer

Содержание EHF-2

Страница 1: ...midifier to function to its full capability be certain to install in accordance with Armstrong recommendations These installation and maintenance guidelines should be used by experienced person nel as...

Страница 2: ...Control humidistat 8 High limit duct humidistat 9 Fan interlock switch 10 Wiring diagrams 11 Capacity chart 12 Physical data 13 Submittal drawings C Principle of Operation Page 15 1 Operation 2 Sugge...

Страница 3: ...applicable building plumbing and electrical codes 3 Site Selection See Fig 3 1 Electronic steam humidifiers should be installed in locations that allow routine inspection and accessibility for mainte...

Страница 4: ...a wall by means of 3 8 diameter lag screws or other suitable fasteners capable of supporting the maximum operating weight of the humidifier Model EHU 600 Making sure the humidifier is level hold it ag...

Страница 5: ...se only wire with copper conductors rated 90o C or higher for high voltage and grounding g Avoid running high voltage wire next to PC board Use bottom knockout for high voltage wire inlet 3 Water Fill...

Страница 6: ...and type of steam dispersion tube has been selected See Chart 6 1 for proper dispersion tube lengths The standard dispersion tube has a built in slope to allow for gravity drainage of condensate back...

Страница 7: ...city per Tube Figure 7 4 Disperson Tube Below Steam Outlet on Humidifier c Insert the dispersion tube into the duct so the holes face upward Never install the tube with the holes facing downward Faste...

Страница 8: ...e 8 6 If the optional 10 ft flexible steam hose is used cut the steam hose to length as required Wipe out the inside of each hose end before installing Connect the cut end of the hose to the dispersio...

Страница 9: ...mounted control humidistats Armstrong Part C1472 are also available for installation where sensing and control from return air or exhaust air ducts is preferable Mounting The Armstrong Control Humidis...

Страница 10: ...e humidifier steam output at the proper modulated rate to maintain 40 RH The humidstat will send a 1 9 to 3 9 Vdc signal to the humidifier as the space humidity drops from 42 5 to 37 5 RH 2 5 RH throt...

Страница 11: ...trong Part A9023 All Pressure and electrical connections and set point adjustments are on side for each installation Temperature limit 32 F to 180 F Maximum surge pressure 10 psig Rated pressure 45 H2...

Страница 12: ...Installation and Maintenance EHU 600 Series Humidifiers 12 10 Wiring Diagram Figure 12 1 EHU 600 Wiring Diagram...

Страница 13: ...7 4 8 45 17 7 7 20 9 1 23 10 5 30 13 7 35 16 50 22 8 55 25 60 27 3 69 31 4 86 39 2 36 3 5 8 50 19 8 7 22 10 26 11 8 33 15 38 17 3 55 25 61 27 8 66 30 77 35 96 43 7 42 0 8 6 60 22 10 26 11 8 30 13 7 38...

Страница 14: ...ply Front 151 2 394 35 16 84 35 16 84 L Electrical Supply Side 31 8 80 2 51 2 51 M Electrical Supply Front 41 2 114 21 2 64 21 2 64 N Fan Height EHF 2 13 330 N A N A N A N A N Fan Height EHF 3 16 406...

Страница 15: ...uce steam Fig 15 1 When the water level rises as shown in Fig 15 2 increased electrical current flows through the water producing more steam This increase will continue until the required output of st...

Страница 16: ...HU 600 Series has a patented self regulating maximum output feature that eliminates manual adjustment and improves humidity control In low demand situations units with greater capacity can quickly ove...

Страница 17: ...circuit shall provide automatic protection from excessive current and high water overflow k The humidifier fill water line s shall have an air gap to prevent backflow syphoning of contami nated water...

Страница 18: ...the tank water After extended use repeated lighting of the Tank Full light indicates that in spite of periodic draining of mineral laden water the steam generator should be inspected and either clean...

Страница 19: ...k See Figure 19 1 7 Disconnect the control wiring to terminals 3 and 23 High Limit Humidistat and terminals 2 and 24 Air Proving Switch then jumper them out with the tabs provided or a short piece of...

Страница 20: ...y increasing the water s conductivity b If Tank Full light illuminates with water level below midway point in the tank the back pressure due to duct static or steam dispersion piping is too high Consu...

Страница 21: ...verify that it is working Look at the tube mounting plate there is anArmstrong A Logo or UP sticker which should be pointing up If not the tube will not drain properly See Figure 21 1 22 When using EH...

Страница 22: ...so this maintenance is required when you can least afford to perform it Hopefully understanding the problem and possible solutions will help avoid problems in the first place How water affects the EH...

Страница 23: ...mineral accumulations from the water This is a bottom blowdown so if minerals stick to the sides of the steam generator they will accumulate The standard drain interval is every 30 minutes for the EHU...

Страница 24: ...proper operation The water is too pure when the Tank Full light comes on excessively e Magnetic Treatment Magnetic coils designed to allow water to be magnetized have been found useful in some instanc...

Страница 25: ...ution Muriatic acid can cause severe chemical burns if not handled properly Wear rubber gloves and eye protection when using Read and follow carefully the safety procedures on the package a Obtain sev...

Страница 26: ...or tank Make sure all electrical connections are tight see Page 6 Check unit for proper operation 4 Electrode Installation Models EHU 601 and EHU 602 Three Phase a Clean the inside of the steam genera...

Страница 27: ...crew as shown Tighten the nuts and screw A 7 16 socket on an extension makes this step and the next much easier and safer c Set the two flat washers in place as shown Then set the inner electrode in p...

Страница 28: ...Figure 28 1 Model EHU 600 3 Phase Figure 28 2 Model EHU 600 1 Phase Model EHU 600 is shown above Models EHU 601 and EHU 602 are similar but some part numbers are different Parts Description 1 Hose Cla...

Страница 29: ...nk This signals that the diagnostics routine has begun For the purpose of the diagnostic function the lights on the front panel of the humidifier correspond to assigned input and output circuits Note...

Страница 30: ...dified or stat is mis wired or malfunctioning If All the lights are on then all controls are allowing the humidifier to fill In case of component malfunction consult your Armstrong Represen tative or...

Страница 31: ...cker with Contactor cycles or B W G or without sensor or pigtail chatters Unit fills continuously G B W 5 demand lights flicker with Contactor chatters or without sensor or pigtail Unit will not fill...

Страница 32: ...remedy with respect to the above limited warranty or with respect to any other claim relating to the products or to defects or any condition or use of the products supplied by Armstrong however cause...

Отзывы: