background image

3 - Insulating with Arma-Chek D >> Using Pre-Covered Sheets

APPLICATION MANUAL  

 

D

© ARMACELL UK LTD.

Insulating with Arma-Chek D >> Using Pre-Covered Sheets

GENERAL PROCEDURES

Arma-Chek D pre-coated sheet material is available in a 
continuous roll form and can be used for large bore pipe 
work, ductwork, vessels and fl at surface application.
Pre-coated  Arma-Chek  D  sheet  can  be  fabricated  as 
you would with regular Armafl ex sheet, following addi-
tional recommendations contained in this manual. (For 
more information on Armafl ex sheet application, refer to 
the Armafl ex Installation Manual.)
For the insulation of pipes with pre-coated sheet mate-
rial the following rules apply due to the greater bending 
stress on the adhesive seams:

Outer  pipe - Ø

Arma-Chek D  (AF)

mm

13 mm

19 mm

25 mm

≥ 88.9

≥ 114.3

≥ 139.7

≥ 168.3

≥ 219.1

Outer  pipe - Ø

Arma-Chek D  (NH)

mm

13 mm

19 mm

25 mm

≥ 88.9

≥ 114.3

≥ 139.7

≥ 168.3

≥ 219.1

* Tolerance of insulation thickness ± 1 mm
1.  This table is valid for ambient conditions of 5°C. For lower applica-

   tion temperatures the rigidity and tension of the sheet material can 

   increase  thus  lead-ing  to  other  conditions  than  mentioned  in  this 

   table!
2.  In case of insulating bends with pre-coated sheet-material, please 
   contact Armacell technical department.

ARMAFLEX  ADHESIVE  AND  ITS  USE  ON 

LARGE BORE PIPEWORK - OD > 600 mm

All-over  adhesive  coverage  should  be  applied  to  both 
the underlying surface of Arma-Chek D pre-coated sheet 
and the pipework surface to which it is to be adhered 
when the pipework/insulation outer diameter is greater 
than 600 mm. 
This should reduce the stress present on the main fi xing 
seam and prevent the sheet from ”bellowing” by allow-
ing equal product weight distribution.

PIPEWORK OFFSET BEND ANGLES

1.  Determine the dimension c.

   

2.  Determine the circumference by placing a strip of    
   Arma-Chek D pre-coated sheet.

   

3.  Transfer the measurements to the pre-coated 
   Arma-Chek D sheet material as
   shown in the fi gure.

   

4.  Completed Arma-Chek  pipework  bend  angle  made 
   of factory-coated Arma-Chek D sheet material.

D (9)

Содержание Arma-Chek D

Страница 1: ...application manual ARMA CHEK D application manual application manual ARMA CHEK D D...

Страница 2: ...application manual ARMA CHEK D ARMACELL UK LTD D APPLICATION MANUAL D...

Страница 3: ...ways use the correct speci ed Arma ex adhesives Do not assume they will always do the same job If in doubt consult the Armacell technical department local agent On external installations always ensure...

Страница 4: ...ntire surface smoothing the covering round making sure there are no air pockets present Always check for alignment and avoid creases and crinkles during that time e If the surfaces are left to dry too...

Страница 5: ...clean the seams and joints use the Arma ex cleaner Peel back release paper and cover the entire seam line with an additional 50 mm overlap where appli cable applying pressure during the installation C...

Страница 6: ...General Working with Arma Chek D ARMACELL UK LTD D APPLICATION MANUAL 1 General Working with Arma Chek D 4 D...

Страница 7: ...d x using the factory applied adhesive strip 5 Use correct Arma ex adhesive to secure the longi tudinal seam Apply on one side only Always remember to stagger longitudinal seams 6 Secure the butt end...

Страница 8: ...seam of the throat using 20 mm wide Arma Chek S Butyl Tape Always ensure the tape is applied such that a watershed is achieved Note In some circumstances it may be preferable to fabricate segment ttin...

Страница 9: ...ARMAFLEX TUBE Note Yellow lines indicate where cuts are to be made Always follow instructions related to the application of pre coated Arma Chek S tubes as stated in the above procedures relating to a...

Страница 10: ...over the tting The oversize tting should extend by the wall thickness of the over sized fabrication minimum of 25 mm is required over the adjoining insulation On the butt end of the adjoining insulat...

Страница 11: ...ness 1 mm 1 This table is valid for ambient conditions of 5 C For lower applica tion temperatures the rigidity and tension of the sheet material can increase thus lead ing to other conditions than men...

Страница 12: ...e by drawing the half elevation on the edge of the Arma Chek sheet 4 Completed Arma Chek pipe reducer made of factory coated Arma Chek Dsheet material with a straight nish ECCENTRIC REDUCER FLAT BACK...

Страница 13: ...meter of the connected pipes 2 x ins thickness Note 5 mm must be added to the jacket height deter mined 5 mm must be subtracted from all measur ments for openings 2 Cross section A A Determine the cir...

Страница 14: ...borders directly on the ange with a 100 mm wide strip of Arma ex Determine the dimensions of the ductwork surface to be insulated On bends the inner throat and outer dimensions are determined using st...

Страница 15: ...HANGING DUCTWORK Use the Arma x duct supports to optimize the preven tion of thermal bridging and simplify the hanging of duct work VESSELS 1 First insulate the vessel jacket with Arma Chek D pre coat...

Страница 16: ...Insulating with Arma Chek D Using Pre Covered Sheets ARMACELL UK LTD D APPLICATION MANUAL 3 Insulating with Arma Chek D Using Pre Covered Sheets 14 D...

Страница 17: ...are no gaps present in all the seams and joints Note Refer to the Arma ex Installation Manual at all times 2 For Arma Chek D covering adhesive is only required on the Arma ex and on the overlapping ar...

Страница 18: ...ongitudinal seam of the covering with the correct Arma ex adhesive Continue to install the covering along the ductwork allowing for a 50 mm overlap on all butt joints DUCTWORK BENDS IRREGULAR SHAPES 1...

Страница 19: ...seg ment of the assembled segment bend and determine the circumference 2 Transfer the circumference measurement U to the Arma Chek Dcovering material and draw in a line dividing it in half Now add a 5...

Страница 20: ...pipe and transfer this to the covering material Halve the circumference 3 Transfer segment width for the throat seam to each end of the circumference drawn and the segment width for the back of the be...

Страница 21: ...a pair of scissors OFFSET ANGLES 1 Determine the circumference U of the Arma ex in sulated offset angle the maximum a and minimum b height and the Arma ex insulated outer diameter of the pipe D to wh...

Страница 22: ...material to the insulation material Secure the seams with Arma Chek D self adhesive tape on indoor applications with 100 mm wide strips of the covering material applied with all over adhesive coverag...

Страница 23: ...eathering overlap length minimum equal to the insulation thickness of the non covered area Method 2 1 Measure the following diameters of the end cap a smaller insulated outer diameter of insulated bod...

Страница 24: ...ARMACELL UK LTD D APPLICATION MANUAL 4 Covering Using Arma Chek D Covering Covering Of Insulated Objects Using Arma Chek D Covering 22 D...

Страница 25: ...application manual ARMA CHEK D ARMACELL UK LTD APPLICATION MANUAL D D...

Страница 26: ...ightweight and easy to apply insulation system resistant to mechanical impact D D Arma Chek R The insulation system with extra system security that minimises the risk of under insulation corrosion UIC...

Отзывы: