Service Procedures
MRM Malibu/Sovereign
24
With the test equipment connected to the
potential equalization connection point in the
building, measure with the probe from the test
equipment on the following parts:
1. Potential equalization connector on chas-
sis foot end
2. Chassis lift-end
(both movable (a) and fixed part (b))
3. Chassis foot-end
(both movable (a) and fixed part (b))
4. MPA pump: metal housing
5. Field wiring box: PE-cable to chassis
6. Control box: earth connection point on
PCB
1
2a
2b
3b
3a
4
5
6