background image

5

General Information

Supplier Information

This product has been manufactured by: 

ArjoHuntleigh AB

Hans Michelsensgatan 10

211 20 Malmö

SWEDEN

Definitions Used in this Manual

Means:  Failure  to  understand  and  follow

these  instructions  may  result  in  injury  to

yourself and others.

Means:  Failure  to  follow  these  instructions

may cause damage to the product(s).

Means:  This  is  important  information

regarding the correct use of the equipment.

Intended Use

The Arjo  Semi-Permanent  Rack  system  is

intended  to  be  used  as  a  temporary  or

permanent free standing system from which

to  transfer  patients  using  one  of  Arjo's

ceiling lifts. It is intended to be used in long-

term  care,  nursing  homes  and  home  care

environments,  including  private  homes  or

other health care settings.

Verifying the Package Contents 

upon Receipt

Upon  receipt  of  the  equipment,  verify  it

against the packing list to make sure that it

is  complete  and  inspect the  equipment  for

possible damage due to shipping. If there is

any damage, DO NOT USE the equipment

WARNING:

CAUTION:

NOTE:

and  notify  the  carrier  immediately  to  file  a

claim.  Provide  complete  information

concerning  damage  claims  or  shipping

errors  to  your  local  Arjo  representative.

Include all equipment identification numbers

and  group  part  numbers  (if  any)  as

described  above  along  with  a  full

description of damaged parts.

How to Use this Manual

To  ensure  the  safe  operation  of  the  Arjo

Semi-Permanent  Rack  system,  read  the

entire  manual  carefully  before  installing  or

servicing this equipment.
If  anything  is  not  completely  understood,

please 

contact 

your 

local  Arjo

representative  for  more  details.  Failure  to

comply  with  warnings  in  this  manual  may

result in injuries.

WARNING: Do not attempt to use this

equipment without fully understanding

the  information  contained  in  this

manual.

Содержание KWIKtrak 4-Post

Страница 1: ...ASSEMBLING INSTRUCTIONS KWIKtrak 4 Post Semi Permanent Rack Assembly 001 11950 EN rev 5 01 2021...

Страница 2: ...ing to the Arjo group of companies Arjo 2021 As our policy is one of continuous improvement we reserve the right to modify designs without prior notice The content of this publication may not be copie...

Страница 3: ...Permanent Rack System 8 Sold Seperately 9 Required Tools 9 Assembling Instructions 10 Assembling the 4 Post Rack 10 Post Assembly Corner Brackets 10 Post Assembly Levelling Feet 11 End Stoppers 12 Fas...

Страница 4: ...ther appliances supplied by Arjo Furthermore unauthorized modifications on any Arjo equipment may affect its safety Arjo will not be held responsible for any accidents incidents or deficiencies of per...

Страница 5: ...Receipt Upon receipt of the equipment verify it against the packing list to make sure that it is complete and inspect the equipment for possible damage due to shipping If there is any damage DO NOT US...

Страница 6: ...e present see table on page 8 Follow the assembly procedure sequence Use each and every one of the parts DO NOT leave any out This equipment must be used by a caregiver with proper training to work wi...

Страница 7: ...talogue number Indicates a potential risk refer to the Instructions for Use IFU for details Manufacturer s serial number Safe Working Load Indicates the maximum load for which the device is rated for...

Страница 8: ...track X 2 4 Parallel track Y 2 5 Autolock end stoppers 6 6 XY trolley 2 7 Mobile track X 1 8 Plastic end cap 6 10 or 12 according to model Plastic end cap halves for kit including H140 rails 2 or 6 ac...

Страница 9: ...ignation Sold Separately Fig 3 Required Tools 5 mm Allen key 17 mm hexagonal key 6 mm Allen key Bubble level 8 mm Allen key 700 15510 700 10650 Trolley for portable lift Charger interface for fixed ce...

Страница 10: ...s Verify that the lockwashers are installed at their proper place as shown Fig 4 2 Fasten the corner bracket assembly to the top of each post Do so for all four posts Properly insert the two screws M1...

Страница 11: ...30 does not protrude into the inner cavity of the levelling feet before attempting to insert the posts Fig 5 4 Adjust the bottom part of the levelling feet so as to leave about 10 mm 3 8 in for later...

Страница 12: ...ackets make the installation safer by greatly reducing the risk of the mobile track shifting from its position in the event that the end of the track should be subjected to a violent impact prevent th...

Страница 13: ...rly inserted on the correct side see Fig 8 Fig 8 6 Choose two of the four fixed track sections that will hold the trolleys for the mobile track see Fig 2 item 4 7 Slide the individual XY kit trolleys...

Страница 14: ...careful not to allow the trolleys for the mobile track or the end stoppers to fall out Fig 10 9 Make sure that the fixed tracks are positioned flush with the outer edges of the corner bracket of the...

Страница 15: ...the ground while the other adjusts the level by rotating the bottom of the levelling feet until the horizontal track is perfectly horizontal 16 Move the bubble level to the next horizontal track and r...

Страница 16: ...bile track that allows the lift to move within the area spanned by the 4 Post system Once all four fixed tracks are joined to their corresponding posts 17 Slide the mobile track onto the wheeled troll...

Страница 17: ...uctions Fig 14 Once the mobile track is in place 18 Straighten the track so that it is squared to the fixed tracks 19 Tighten both M12 bolts on each trolley with a 19 mm wrench see Fig 15 Fig 15 END S...

Страница 18: ...fixed track evenly If not loosen the setscrews readjust the mobile track and retighten the setscrews see Fig 15 21 Slide the autolock end stoppers on the mobile track to a distance of 25 mm 1 in from...

Страница 19: ...pper to the track Insert the end stopper into the track and test the end stopper by trying to push it back out of the track The stopper should not be able to move Firmly tighten the setscrews using a...

Страница 20: ...20 Assembling Instructions Fig 19 Fig 20 End stopper Install the ceiling lift before installing the second end stopper Torque to 20 N m 15 lbf ft...

Страница 21: ...ted Make sure that the track is properly assembled to the posts Make sure that all posts are straight Clean the inside of the tracks to make sure that there is no dust or grease build up inside the tr...

Страница 22: ...lley does not move smoothly in the track Is the track clean Clean the track with a damp cloth Is the trolley centred in the track Re centre the trolley Is the trolley damaged Replace the trolley The p...

Страница 23: ...mm 140 mm track 2414 mm 180 mm track A B B A Product Codification 9 9 0 X X X X A B 30 3 0 m 10 ft 35 3 5 m 11 5 ft 40 4 0 m 13 ft 45 4 5 m 14 75 ft 30 3 0 m 10 ft 35 3 5 m 11 5 ft 40 4 0 m 13 ft 45 4...

Страница 24: ...Intentionally left blank...

Страница 25: ...Intentionally left blank...

Страница 26: ...Intentionally left blank...

Страница 27: ...FZ LLC 2 FH WK ORRU 4 XLOGLQJ 1RUWK 7RZHU Dubai Science Park Al Barsha South P O Box 11488 Dubai United Arab Emirates Direct 971 487 48053 Fax 971 487 48072 Email Info ME arjo com NEDERLAND Arjo Nede...

Страница 28: ...QRPLF SDWLHQW KDQGOLQJ SHUVRQDO K JLHQH GLVLQIHFWLRQ GLDJQRVWLFV DQG WKH H HFWLYH SUHYHQWLRQ RI SUHVVXUH XOFHUV DQG YHQRXV WKURPERHPEROLVP ZH KHOS SURIHVVLRQDOV DFURVV FDUH HQYLURQPHQWV WR FRQWLQXDOO...

Отзывы: