background image

001.10610.EN rev

. 13

Room Assessment 

7

Before installing the 

EASYTRACK

 prepare the installation as follows:

1)  Survey the room where you plan to install the 

EASYTRACK

 

System.

• 

Make sure the room meets all the specifications 

outlined in 

“EASYTRACK System Requirements”

 

section.

2)  Make sure the pick-up point will be inside the transfer 

zone:

•  Over a bed : 

approximately 915 - 1020 mm (36 - 40”) from the head 

of the bed.

•  Over a tub: 

approximately 400 - 460 mm (16 - 18”) from the end 

of the tub.

•  Allow 1000 mm (39”) of the open area for transfer 

working space.

3)  Determine the location for the three posts considering the 

following, see Fig. 6:

•  Distance from the wall, adjacent to the two standard 

posts, to allow clearance for the pivot track overhang.

•  Minimum distance of 1.9 m (75”) between the two 

standard posts.

•  Transfers should only take place between the 

EASYTRACK

 System’s posts.

•  Centre the pivot post as much as possible between 

both standard posts.

Fig. 5

 

400 - 460 mm 

(16 - 18’’)

915 - 1020 mm

(36 - 40’’)

Bed

Bath

tub

Ø 1 m (39”)

Ø 1 m (39”)

Room Assessment 

Fig. 6

NOTE: 

Although it is not a requirement to 

place the posts directly under a joist in the 

ceiling, it is preferable. It does not matter which 

direction the plates are facing, see Fig. 7

Fig. 7

Joists or 

Trusses

EASYTRACK

POSTS 

Sheet rock

Preferable

Joists or 

Trusses

Acceptable

EASYTRACK POST 

Sheet rock

Содержание EASYTRACK 9330010

Страница 1: ...001 10610 EN rev 13 10 2019 INSTRUCTIONS FOR USE EASYTRACK SYSTEM 3 POST ASSEMBLY Model no 9330010...

Страница 2: ...ing to the Arjo group of companies Arjo 2019 As our policy is one of continuous improvement we reserve the right to modify designs without prior notice The content of this publication may not be copie...

Страница 3: ...ice 3 Homecare Environment Considerations 3 Symbols Used 4 General Symbols 4 Product Description 5 EASYTRACK System Requirements 6 Ceiling Requirements 6 Floor Requirements 6 Other Requirements 6 Room...

Страница 4: ...Page intentionally left blank...

Страница 5: ...Arjo vendor If a serious incident occurs in relation to this medical device affecting the user or the patient then the user or patient should report the serious incident to the incident to the medica...

Страница 6: ...part and lead to a patient fall The life span is the safe operating time period before a complete overhaul is required Following are factors that have an impact on the EASYTRACK life span aging of th...

Страница 7: ...r Do not drop product may cause breakage Do not completely submerge in water Do not attempt to over extend the track past the locking point Do not install product if Neoprene on top or bottom plate ap...

Страница 8: ...5223 3 15 Points out the manufacturer s catalogue number Indicates a potential risk see Instructions for Use for corrective action SN Points out the manufacturer s serial number SWL SWL is the maximum...

Страница 9: ...5 Post top for pivot post 700 10560 1 6 Top plate 700 10400 3 7 Pivoting Track extendable 1 9 3 m with the standard trolley 700 10850 1 8 Standard trolley 700 10650 1 9 Standard post 700 10500 2 10 C...

Страница 10: ...t fall Floor Requirements Flooring must comply to local building code standards WARNING Termites or water damages may affect the structure of the floor Floor must be clear of any dust grease water or...

Страница 11: ...the three posts considering the following see Fig 6 Distance from the wall adjacent to the two standard posts to allow clearance for the pivot track overhang Minimum distance of 1 9m 75 between the t...

Страница 12: ...ps into place Fig 10 5 Take one of the posts out of the box Turn the post upright Place the clip on level see Fig 2 item 16 onto the post at approximately waist height Fig 11 6 Place the post onto the...

Страница 13: ...longer visible Fig 19 Incorrect Correct Red mark visible Red mark not visible WARNING Red mark must not be visible for the post to be safely secured see the warning label apposed on each post as show...

Страница 14: ...f the pivot post Tilt the track upward 45 to latch it onto the post Fig 28 21 Extend the track and thread the wheels of the trolley through the upper portion of the track Fig 29 22 Continue to extend...

Страница 15: ...lation against Fig 36 Make sure the red mark on top of each posts is not visible Using the clip on level make sure that all posts are straight Make sure that the both tracks are locked into place and...

Страница 16: ...ged from the trolley tilt it to a 45 angle and lift the end at the pivoting post to release it from the hooks Fig 42 9 Put the end stopper back on the track and secure it by tightening the Allen key 1...

Страница 17: ...essed in when there is downward pressure on them Pressure must be released to press in pin d Push top portion of post downward e Repeat until the metal pins are no longer visible and the top of the po...

Страница 18: ...the post when turning the upper portion clockwise See assembling instruction step 9 4 Not able to tighten post enough to hide the red mark Have you extended the post long enough a Release pressure usi...

Страница 19: ...and layout Does the pivoting track need to be more centred between the two standard posts See figure below Pivoting post may need to be moved so it is more centred between the two standard posts Follo...

Страница 20: ...vel post accordingly Red mark on top of each post under the top plate is not visible The tracks are secured in place Press down on each track to make sure they are locked onto the posts Clean the insi...

Страница 21: ...0 kg 440 lb Range Fixed Track 1900 3160 mm 74 124 1 2 Pivot track 1900 3160 mm 74 124 1 2 Post length 2130 2745 mm 84 108 Material Aluminium END OF LIFE DISPOSAL Package Corrugated cardboard recyclabl...

Страница 22: ...Page intentionally left blank...

Страница 23: ...6 87426222 E mail Italy promo arjo com MIDDLE EAST Arjo Middle East FZ LLC Office 908 9th Floor HQ Building North Tower Dubai Science Park Al Barsha South P O Box 11488 Dubai United Arab Emirates Dire...

Страница 24: ...d health challenges With products and solutions that ensure ergonomic patient handling personal hygiene disinfection diagnostics and the effective prevention of pressure ulcers and venous thromboembol...

Отзывы: