Chapter 3: Configuration and commissioning
22
1X-X3 Installation Manual
Actuator delay for start MCP 41
Extinguishing agent flow 42
Fire sounder operation during a zone test 43
Fire sounder re-sound 43
Fire Sounders silence disabled time 44
Zone configuration 45
Zone delay 45
Zone type 46
Changing user level passwords 47
Auxiliary 24 V reset 48
Configuration, software, and PCB identification 48
Expansion board configuration 49
Adding an expansion board 49
Expansion board configuration 49
Commissioning 51
Before commissioning the control panel 51
Commissioning the control panel 52
Functional tests 53
Response times 54
Содержание 1X-X3
Страница 1: ...1X X3 Installation Manual P N 501 419003 1 11 REV 01 10 ISS 11NOV13 ...
Страница 6: ...iv 1X X3 Installation Manual ...
Страница 26: ...Chapter 2 Installation 20 1X X3 Installation Manual ...
Страница 64: ...Chapter 4 Maintenance 58 1X X3 Installation Manual ...
Страница 71: ...Chapter 5 Technical specifications 1X X3 Installation Manual 65 Figure 17 Control panel cabinet without cover ...
Страница 72: ...Chapter 5 Technical specifications 66 1X X3 Installation Manual Figure 18 Control panel cabinet with cover ...
Страница 82: ...Appendix B Regulatory information 76 1X X3 Installation Manual ...
Страница 86: ...Index 80 1X X3 Installation Manual ...
Страница 87: ......
Страница 88: ......