background image

39

7. maintenance

Important

Maintenance is an essential part of the safe and effi cient 
operation of the boiler and ensures its durability. It should 
be performed according to the instructions given in current 
legislation. Perform combustion analysis regularly in order to 
check the operating effi ciency of the boiler and to make sure 
any polluting substances released are within the boundaries 
set by current legislation.
Before beginning maintenance work:

-  Disconnect the appliance from the electricity supply by 

turning the external bipolar switch to the “OFF” position;

-  Close the gas isolation valve and the central heating and 

domestic hot water system isolation valves.

After the work has been completed the initial settings will be 
restored.

7.1 General comments

It is recommended that the following inspections be carried 
out on the boiler at least once a year:
1.   Check the seals in the water part and, if necessary, replace 

thegaskets and restore the seal to perfect working order.

2.   Check the seals in the gas part and, if necessary, replace 

the gaskets and restore the seal to perfect working order.

3.   Visually check the overall condition of the boiler.
4.   Following the inspection detailed in point “3”, disassemble 

and clean the combustion chamber, if necessary.

5.   Check and clean the siphon.
6.   Make sure the following heating safety devices are 

operating correctly: - temperature limit safety device.

7.   Make sure that the following gas part safety devices are 

operating correctly: 

 

- absence of gas or fl  ame safety device (ionisation).

8.   Check the effi  ciency of the domestic hot water production 

process (test the fl  ow rate and temperature).

9.   Perform a general inspection of the boiler operation.
10.  Remove oxide from the detection electrode using an 

emery cloth.

11. These checks are not exhaustive, further mechanical, 

electrical and combustion maintenance checks maybe 
required.

12. Check and adjust combustion settings (high & low)

The presence of oxide inside the heat exchanger doesn’t 
prejudice the performances of the boiler. In case it is 
considered necessary to proceed with the cleaning of the 
heat exchanger.

Proceed as follows:
CLEANING THE FLUE GAS SIDE
The inside of the primary heat exchanger 19 may be accessed 
by dismantling the burner - see picture.
Clean the heat exchanger with a vacuum cleaner with the aid 
of a non-metallic brush, by avoiding the use of liquid cleaners 
and detergents.
WARNING!
It is mandatory to replace 
the seal (g - see picture) 
every time the burner is 
dismantled.
Moreover, clean the fl  ue 
gas duct 3 (located in front 
of the heat exchanger) 
prior to repositioning it.
During the removal of the 
siphon, place a container 
below the boiler to catch 
any spilled water.

7.2 Operational test

After having carried 

out the maintenance operations, fi ll the heating circuit at a 
pressure of approximately 1.5 bar and release the air from the 
system.
Fill the domestic hot water system at the same time.

-  Begin operating the boiler.
-  If necessary, release the air from the heating system again.
- Check the settings and make sure all the command, 

adjustment and monitoring parts are working correctly.

-   Check the fl ue system is sealed and operating correctly.

7.3 Draining procedures

The heating system must be drained using the following 

procedure:

-  Switch off the boiler, make sure the external bipolar switch 

is in the OFF position and shut off the gas valve;

-  Loosen the automatic air relief valve;
- Open the system drain off cock and collect the escaping 

water in a container;

-  Empty the water from the lowest points of the system (where 

applicable).

If the system is to be left inactive in areas where the room 
temperature may fall below 0°C during winter, we recommend 
that anti-freeze liquid is added to the water in the heating 
system in order to avoid the need for repeated draining; when 
this liquid is used make sure it is compatible with the stainless 
steel used for the bodywork of the boiler.
We recommend the use of anti-freeze products which 
contain PROPYLENE GLYCOLS as these inhibit corrosion and 
that they are used in conjunction with the anti-scaling and 
anti-corrosion function, in the quantities suggested by the 
manufacturer, at the minimum temperature.
Regularly check the pH level of the water/anti-freeze mix in 
the boiler circuit and replace it when the value measured is 
lower than the limit prescribed by the manufacturer.

DO NOT MIX DIFFERENT TYPES OF ANTI-FREEZE.

The manufacturer will not be held liable for any damage 
caused by the appliance or the system due to the use of 
inappropriate anti-freeze substances or additives.

7.4 Draining the domestic hot water system 

Every time there is a danger of freezing, the domestic hot 
water system must be drained as follows:
-  Shut off the water mains inlet valve;
-  Open all the hot and cold water taps;
- Empty the water from the lowest points of the system 

(where applicable).

WARNING 

Before handling, empty all components which may contain hot 
water, perform bleeding where necessary.
Descale the components in accordance with the instructions 
provided on the safety data leafl et supplied with the product 
used, make sure the room is well ventilated, wear protective 
clothing, avoid mixing different products, and protect the 
appliance and surrounding objects.
Seal all openings used to take a gas pressure reading or to 
make any gas adjustments.
Make sure that the nozzle is compatible with the supplied gas.
If a smell of burning is detected or smoke is seen leaking from 
the appliance, or there is a smell of gas, disconnect it from the 
electricity supply, shut off the gas valve, open the windows and 
call for technical assistance.

7.5 Cleaning the primary exchanger

Cleaning the combustion side
The inside of the primary exchanger is accessed by removing 
the burner. Clean using a non-metallic rifl e-type brush.

7.6 Cleaning the trap

The trap is accessed by emptying the condensate bowl loca-
ted in the bottom section. Wash with water and detergent.
Replace the condensate collection bowl in its housing.
NB: In the event of prolonged use of the appliance, the trap 
must be fi lled before being used again.
A lack of water in the trap may cause products of combustion 
to be temporarily released into the atmosphere.

Содержание EGIS HE 24

Страница 1: ...Installation and Servicing Instructions EGIS HE CONDENSING WALL HUNG GAS BOILER EGIS HE 24 EGIS HE 30 Country of destination GB IE GC Numbers EGIS HE 24 47 116 71 EGIS HE 30 47 116 72...

Страница 2: ...aration 28 4 1 1 Electricity Supply 28 4 1 2 Filling the Heating System 28 4 1 3 Filling of the DHW System 28 4 1 4 Gas Supply 28 4 1 5 Water Treatment 28 4 2 First Igniton Operation 29 4 3 Ignition p...

Страница 3: ...chnical and Customer Service Departments at High Wycombe TECHNICAL DEPARTMENT CUSTOMER SERVICE DEPARTMENT Tel 0333 240 7777 Tel 0333 240 8777 Fax 01494 459775 Fax 01494 459775 GUARANTEE The manufactur...

Страница 4: ...y present a potential hazard In the event of a fault and or malfunction turn the appliance off turn off the gas cock and do not attempt to repair it yourself Contact a quali ed professional instead Be...

Страница 5: ...any rolling ladders are positioned securely that they are suitably strong that the steps are intact and not slippery and that the ladders are tted with handrails on either side of the ladder and para...

Страница 6: ...usly allows for accessing the setting adjustment and diagnostics parameters qualified engineers only b Pressing the buttons simultaneously allows for modifying and saving the parameter settings Qualif...

Страница 7: ...hanger 6 C H Flow temperature probe 7 Inspection door 8 Gas valve 9 Condensate trap 10 Secondary heat exchanger 11 Safety valve 13 D H W Flow switch 14 C H circuit lter 15 Circulation Pump with air re...

Страница 8: ...estic Cold Water Inlet E Central Heating Return 450 0 0 3 0 0 3 50 50 2 5 Minimum clearances In order to allow easy access to the boiler for maintenance operations The boiler must be installed in acco...

Страница 9: ...easonal SAP ef ciency 2009 annual Loss when stopped T 30 C 0 2 0 1 Loss of burner gas when operating 1 8 1 7 EMISSIONS Available air pressure Pa 100 100 NOx class class 5 5 NOx emissions mg kWh Flue g...

Страница 10: ...talling the boiler where the air inlet can be polluted by chemical products such as chlorine swimming pool area or ammonia hair dresser or alkalin products launderette 3 1 1 Flue Detailed information...

Страница 11: ...changer from scale build up and corrosion is of primary importance All water is subject to the in ltration of impurities and in some cases more than others depending on geographical location Premature...

Страница 12: ...washing maching or sink trap The connection must be upstream of the washing machine sink If the connection is downstream of the waste trap then an additional trap giving a minimum water seal of 75mm a...

Страница 13: ...d hot water outlet connections 3 2 3 Safety Valve Discharge and Condense Outlet The pressure relief valve pipe is made of copper It should terminate below the boiler safely outside the premises Care s...

Страница 14: ...able circulation pump pressure T20o C Before the equipment is used for the rst time the trap must be lled with water To do this add approximately 1 4 litre of water via the ue outlet before tting the...

Страница 15: ...under oor heating equipment must be protected by a thermostatic valve or by a by pass to prevent the oor from reaching too high a temperature 3 2 8 Water circuit diagram A I B C D E 1 2 3 5 4 6 7 11...

Страница 16: ...ternal bipolar switch and shut off the gas valve To access the inside of the boiler the following is necessary 1 Loosen the two screws on the front casing a pull it forwards and unhook it from the upp...

Страница 17: ...steaming must be considered If the terminal is less than 2 metres above a balcony above ground or above a at roof to which people have access then a suitable stainless steel terminal guard must be tte...

Страница 18: ...3 16 secure the elbow to the boiler The 1 metre horizontal ue kit 3318073 supplied is suitable for an exact X dimension of 753mm Measure the distance from the face of the external wall to the face of...

Страница 19: ...o push them together no clamps are necessary to secure the ue components Before proceeding to t the ue ensure that the maximum ue length has not been exceeded See the tables and that all elbows and be...

Страница 20: ...r onto the vertical starter kit note there is no need to use a clamp to secure this as it is a push t connection the vertical ue kit must then be inserted through the roof ashing this will ensure that...

Страница 21: ...ction of ue pipe or elbow check that the o ring is not dislodged when assembling the ue greasing the seal will aid assembly Twin pipe can also be converted back to Coaxial ue to enable vertical termin...

Страница 22: ...ducts 2 If you need to insert elbows in the air intake and exhaust gas ducts you should consider for each one the equivalent length to be included in the calculation of developed length 3 The exhaust...

Страница 23: ...S2 Air intake and ue gas exhaust unequal lengths FLUE TYPE Maximum Extension Exhaust air m Diameter of pipe mm EGIS HE 24 30 Coaxial System C13 C33 C43 10 10 60 100 B33 10 10 C13 C33 C43 25 25 80 125...

Страница 24: ...l isolation of the appliance by use of a fused double pole isolator having a contact separation of at least 3mm in all poles or alternatively by means of a 3A fused three pin plug and unswitched shutt...

Страница 25: ...sensor wires Loosen the cable clamp using a screwdriver and insert the wires leading from the outdoor sensor one at a time Connect the wires to the terminals as indicated in the gure below Make sure...

Страница 26: ...clock blanking plate or existing clock if tting the RF receiver in a product with an existing mechanical clock from the front control panel of the boiler Using the 4 securing screws supplied with the...

Страница 27: ...exchanger D H W flow switch Switch ON OFF Outdoor sensor Underfloor heating thermostat Room Thermostat 1 CN14 CN3 1 1 CN8 CN9 1 1 CN25 1 Display Rd Rd Bl Bl Br Bk Gry Bk Bl 1 CN6 HV connection N N FLA...

Страница 28: ...leaks discovered IMPORTANT MANUALLY VENT THE HEAT EXCHANGER AT THE MANUAL AIR VENT FAILURE TO VENT ADEQUATELY MAY DAMAGE THE HEAT EXCHANGER PAGE 7 LEGEND 4 4 1 3 Filling of the DHW System Close all ho...

Страница 29: ...n the pump Complete 9 Purge the air by pressing the Mode button for 5 sec Complete 10 Set the heating power See section 4 5 1 Complete 11 Balance the central heating circuit Complete 12 Check operatio...

Страница 30: ...minutes See below If you need to stop it press the ESC button alternatively it is possible to manually vent the heat exchanger At the end check that the system is completely deaerated and if not repea...

Страница 31: ...e temperature of the water coming out of the boiler may be more than 65 C The following icon appears on the display gas boiler activated at the C H maximum power Press the button to select the icon D...

Страница 32: ...3 parameter 1 Maximum Heating Power adjustment submenu 2 parameter 0 Soft light Ignition submenu 3 parameter 5 Heating ignition delay 4 5 1 Maximum Heating Power adjustment The maximum heating power c...

Страница 33: ...13 16 Maximum central heating fan speed 234 93 94 Maximum D H W fan speed 232 93 94 Maximum heating power adjstment 231 70 60 Gas valve restrictor NO NO Gas ow max min 15 C 1013 mbar nat m3 h GPL kg h...

Страница 34: ...ure indicating the operational assembly is followed by a P warning and the code relating to the speci c warning Important If this shutdown occurs frequently contact an authorised Technical Service Cen...

Страница 35: ...pump will continue to run for a maximum of 20 minutes unless a temperature above 9 C is detected in the central heating ow after this the the burner will re heating position until a temperature of 30...

Страница 36: ...of parameters value Programming ESC key to exit from the parameters The information relating to the parameters are indicated on the display Caution The menus reserved for quali ed technicians may only...

Страница 37: ...int 0 254 Post circulation and post ventilation after domestic hot water is drawn 0 OFF 1 ON 0 OFF 3 minutes post circulation and post ventilation after domestic hot water draw off if the boiler tempe...

Страница 38: ...the or buttons but the display will always show 7 to 7 High temperature each step 2 C Low temperature each step 1 C 425 Maximum Central Heating Temperature Zone 1 from 35 to 85 C Param 420 1 82 from 2...

Страница 39: ...again Check the settings and make sure all the command adjustment and monitoring parts are working correctly Check the ue system is sealed and operating correctly 7 3 Draining procedures The heating...

Страница 40: ...8 1 1 General Access Tools TIME 3 min Remove the two screws under the boiler 1 Pull the casing forwards and unhook it from the upper pins 2 Lower the electrical front panel 3 Remove the combustion cha...

Страница 41: ...e 8 2 ELECTRICAL UNIT 8 2 1 Control box access Tools TIME 4 min Remove the front panel as above and pivot the electrical box 1 Unhook the two clip and rotate the cover 2 3 Unscrew the two screws and r...

Страница 42: ...de 8 2 2 Fuse Tools TIME 5 min Open the control box as above 1 Remove the fuse 2 3 8 2 3 Main P C B Tools TIME 5 min After opening the control box disconnect the elctrical plug connections 1 Unhook an...

Страница 43: ...43 8 maintenance guide 8 2 4 Display P C B Tools TIME 5 min Unscrews the four screws and pull the assembly towards you 1 Disconnect the elctrical plug connections unhook and remove the P C B 2...

Страница 44: ...ntral heating lter 8 D H W ow switch assembly 9 Central Heating return 10 Cold water inlet D H W 11 C H drain valve 8 3 2 3 Way valve unit Tools TIME 5 min Unplug the diverter valve cable 1 Remove the...

Страница 45: ...he boiler 1 8 3 4 Automatic air vent Tools TIME 5 min Drain the boiler see 3 3 Remove the clip and lift the AAV from the assembly 1 2 8 3 5 Primary water pressure sensor Tools TIME 5 min Drain the boi...

Страница 46: ...Pump Tools TIME 10 min Drain the boiler see 3 3 Remove the clip and the two screws 1 Disconnect the pipe and then move the pump to the right to disengage 2 Remove the pump 3 Remove the sensor see 3 5...

Страница 47: ...s TIME 10 min Drain the boiler see 3 3 Remove the clip and pull the ow switch assembly towards you 1 Twist the ow switch assembly to disengage 2 8 3 7 C H Filter Tools TIME 5 min Drain the boiler see...

Страница 48: ...0 min Drain primary and domestic hot water circuits Remove the two screws and remove the heat exchanger 1 2 8 3 9 LEFT HAND HYDRAULIC BLOCK ASSEMBLY Legend 1 Left hand hydraulic block 2 By pass assemb...

Страница 49: ...trap Tools TIME 5 min Unscrew the condensate trap from the condensate body 1 8 3 12 Safety valve Tools TIME 5 min Drain the boiler see 3 3 Disconnect the discharge pipe Remove the st clip on the left...

Страница 50: ...pass assembly Tools TIME 5 min Drain the boiler see 3 3 Remove the second clip and pull the assembly towards you 1 2 3 8 3 14 Temperature sensors Tools TIME 5 min NTC1 Black NTC2 Red 1 Unplug the ele...

Страница 51: ...15 Overheat thermostat Tools TIME 5 min Remove the electrical connections Unscrew the screw nad remove the overheat thermostat 1 Remove the clip and the temperature sensor 3 IMPORTANT Do not use cond...

Страница 52: ...TIME 25 min Drain boiler see 3 3 Unscrew the screws of ue collector 1 Disconnect the condensate discharge pipe from the ue collector 2 Remove the ignitor Disconnect the electrical connectios 3 Remove...

Страница 53: ...maintenance guide Remove the silencer Disconnect the gas pipe from the mixer Remove the fan electrical connection Unscrews the two screws Remove the fan mixer group Unscrews the six screws of the bur...

Страница 54: ...54 8 maintenance guide Remove the burner Remove the clips to disconnect the ow and return pipes Unscrew the screws of the main exchanger Remove the main heat exchanger...

Страница 55: ...55 8 maintenance guide 8 4 COMBUSTION GROUP 1 4 5 6 7 9 8 3 Legend 1 Fan 3 Mixer 4 Silencer 5 Gasket Fan 6 Detection electrode 7 Ignition electrode 8 Burner 9 Burner gasket...

Страница 56: ...guide 8 4 1 Spark generator Tools TIME 5 min Remove the electrical connections from the spark genera tor and unhook it 1 8 4 2 Electrodes Tools TIME 5 min Unscrews the four screws 1 Pull the electrod...

Страница 57: ...TIME 15 min Remove the combustion assembly see 4 3 1 Remove the three screws to free the fan 2 Legend 1 Fan 2 Venturi 3 Gasket Fan mixer venturi according to the model Power Fan Venturi diameter 24 kW...

Страница 58: ...lve Tools TIME 15 min Remove the two screws under the boiler and disconnect the gas pipe on the left of the gas valve 1 Remove the gas valve 2 Legend 1 Gas valve 2 Solenoids 3 Throttle adjustment 4 Of...

Страница 59: ...ually How Visual inspection Clean as necessary Flow switch operation Maintenance Interval Annually How Visual inspection Clean as necessary Check ow rate Expansion vessel Maintenance Interval Annually...

Страница 60: ...lean as necessary Condensate trap Maintenance Interval Annually or after cleaning primary heat exchanger How Visual inspection Clean as necessary Add water before replacing Pump Maintenance Interval A...

Страница 61: ...ffect the customer s statutory rights If yes and if required by the manufacturer has a water scale reducer been tted CONDENSING BOILERS ONLY The condensate drain has been installed in accordance with...

Страница 62: ...er Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone...

Страница 63: ......

Страница 64: ...10462500 Ariston Thermo UK Ltd Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Internet www ariston co uk Technical Advice 0333 240 7777 Customer Service 0333 240...

Отзывы: