5. boiler protection devices

The boiler is protected from malfunctioning by means of 
internal checks performed by the electronic microprocessor 
P.C.B., which stops the boiler from operating if necessary.
In the event of the boiler being shut off in this manner, a code 
appears on the display which refers to the type of shut-off and 
the reason behind it.
There are two types of shut-off:

5.1 Safety shut-off 

This type of error is “volatile”, which 
means that the boiler starts up 
again automatically as soon as the 
problem which caused the shut-off 
is removed; the error is indicated by 

the «

Err

» 

(ex.

 

Err/110

) and the 

symbol 

 which appears on the 

display and the error code.
In fact, soon as the cause of the shut-off disappears, the boiler 
starts up again and continues to operate normally.

In the event of error 

108

 - 

Shut-off due to insuffi cient water 

pressure

 inside the heating circuit - the boiler will perform a 

safety shut-off.
You can increase the pressure by fi lling the heating circuit.
In this case or if the re-balancing 
request is performed on a frequent 
basis, switch the boiler off, turn the 
external electric switch to the OFF 
position, shut off the gas cock and 
contact a qualifi 

ed technician to 

check for any leaks of water.

5.2 Shutdown

This type of error is “non-volatile”, which means that it is not 
removed automatically. 

On the display fl ash Err and the error 

code -

es. 

Err/501 

, and appear the symbol 

.

To restore normal operation press the 

 button on the 

control panel.

5.3 Malfunction warning

This warning is shown by the display in the following format:  

5P1

5P1

 = FIRST IGNITION ATTEMPT UNSUCCESSFUL

the fi rst fi gure indicating the operational assembly is followed 
by a P (warning) and the code relating to the specifi c warning.

Important

If this shutdown occurs frequently, contact an authorised 
Technical Service Centre for assistance. For safety reasons, 
the boiler will permit a maximum of 5 resets in 15 minutes 
(5 presses of the RESET button); at the 6th attempt within 
this 15-minute period the boiler will shut down and may 
only be operated again after the electricity supply has been 
disconnected. If the shutdown is occasional or an isolated 
event, this is not a problem.

The fi rst fi gure of the error code (e.g. 1 01) indicates within 
which operational assembly the error occurred.
1 - Primary Circuit
2 - Domestic Hot Water Circuit
3 - Internal Electronic Part
4 - External Electronic Part
5 - Ignition and Detection
6 - Air inlet - fl ue gas outlet
7 - Multi-zone Heating

5.4 Table summarising error codes 

OK

ESC

D.H.W. circuit Central Heating circuit

1 01

Overheat

1 03

Insuffi cient circulation

1 04
1 05
1 06
1 07
1 08

Insuffi cient water (request fi lling)

1 09

System pressure > 3 bar

1 10

C.H. Flow temp. probe circuit open / short circuit

1 12

C.H. Return temp. probe circuit open / short 
circuit

1 14

External sensor circuit open / short circuit

1 16

Floor Thermostat contact open

1 P1

Insuffi cient circulation indication

1 P2

1 P3

D.H.W. circuit

2 05

DHW In Probe Open Circuit - Solar Kit (optional)

Internal P.C.B.’s

3 01

EEPROM error

3 02

Comunication error

3 03

Main P.C.B. error

3 04

Too many (> 5) resets in 15 minutes

3 05

Main P.C.B. error

3 06

Main P.C.B. error

3 07

Main P.C.B. error

Ignition and Detecion

5 01

No fl ame detected

5 02

 Flame detected with gas valve closed

5 04

Flame lift

5 P1

1st Ignition Failed

5 P2

2nd Ignition Failed

5 P3

Flame cut-off

Air Inlet / Flue gas outlet

6 10

Overheat (Main heat exchanger)

6 12

Insuffi cient fan speed

Fig. 5.1

Содержание EGIS HE 24

Страница 1: ...Installation and Servicing Instructions EGIS HE CONDENSING WALL HUNG GAS BOILER EGIS HE 24 EGIS HE 30 Country of destination GB IE GC Numbers EGIS HE 24 47 116 71 EGIS HE 30 47 116 72...

Страница 2: ...aration 28 4 1 1 Electricity Supply 28 4 1 2 Filling the Heating System 28 4 1 3 Filling of the DHW System 28 4 1 4 Gas Supply 28 4 1 5 Water Treatment 28 4 2 First Igniton Operation 29 4 3 Ignition p...

Страница 3: ...chnical and Customer Service Departments at High Wycombe TECHNICAL DEPARTMENT CUSTOMER SERVICE DEPARTMENT Tel 0333 240 7777 Tel 0333 240 8777 Fax 01494 459775 Fax 01494 459775 GUARANTEE The manufactur...

Страница 4: ...y present a potential hazard In the event of a fault and or malfunction turn the appliance off turn off the gas cock and do not attempt to repair it yourself Contact a quali ed professional instead Be...

Страница 5: ...any rolling ladders are positioned securely that they are suitably strong that the steps are intact and not slippery and that the ladders are tted with handrails on either side of the ladder and para...

Страница 6: ...usly allows for accessing the setting adjustment and diagnostics parameters qualified engineers only b Pressing the buttons simultaneously allows for modifying and saving the parameter settings Qualif...

Страница 7: ...hanger 6 C H Flow temperature probe 7 Inspection door 8 Gas valve 9 Condensate trap 10 Secondary heat exchanger 11 Safety valve 13 D H W Flow switch 14 C H circuit lter 15 Circulation Pump with air re...

Страница 8: ...estic Cold Water Inlet E Central Heating Return 450 0 0 3 0 0 3 50 50 2 5 Minimum clearances In order to allow easy access to the boiler for maintenance operations The boiler must be installed in acco...

Страница 9: ...easonal SAP ef ciency 2009 annual Loss when stopped T 30 C 0 2 0 1 Loss of burner gas when operating 1 8 1 7 EMISSIONS Available air pressure Pa 100 100 NOx class class 5 5 NOx emissions mg kWh Flue g...

Страница 10: ...talling the boiler where the air inlet can be polluted by chemical products such as chlorine swimming pool area or ammonia hair dresser or alkalin products launderette 3 1 1 Flue Detailed information...

Страница 11: ...changer from scale build up and corrosion is of primary importance All water is subject to the in ltration of impurities and in some cases more than others depending on geographical location Premature...

Страница 12: ...washing maching or sink trap The connection must be upstream of the washing machine sink If the connection is downstream of the waste trap then an additional trap giving a minimum water seal of 75mm a...

Страница 13: ...d hot water outlet connections 3 2 3 Safety Valve Discharge and Condense Outlet The pressure relief valve pipe is made of copper It should terminate below the boiler safely outside the premises Care s...

Страница 14: ...able circulation pump pressure T20o C Before the equipment is used for the rst time the trap must be lled with water To do this add approximately 1 4 litre of water via the ue outlet before tting the...

Страница 15: ...under oor heating equipment must be protected by a thermostatic valve or by a by pass to prevent the oor from reaching too high a temperature 3 2 8 Water circuit diagram A I B C D E 1 2 3 5 4 6 7 11...

Страница 16: ...ternal bipolar switch and shut off the gas valve To access the inside of the boiler the following is necessary 1 Loosen the two screws on the front casing a pull it forwards and unhook it from the upp...

Страница 17: ...steaming must be considered If the terminal is less than 2 metres above a balcony above ground or above a at roof to which people have access then a suitable stainless steel terminal guard must be tte...

Страница 18: ...3 16 secure the elbow to the boiler The 1 metre horizontal ue kit 3318073 supplied is suitable for an exact X dimension of 753mm Measure the distance from the face of the external wall to the face of...

Страница 19: ...o push them together no clamps are necessary to secure the ue components Before proceeding to t the ue ensure that the maximum ue length has not been exceeded See the tables and that all elbows and be...

Страница 20: ...r onto the vertical starter kit note there is no need to use a clamp to secure this as it is a push t connection the vertical ue kit must then be inserted through the roof ashing this will ensure that...

Страница 21: ...ction of ue pipe or elbow check that the o ring is not dislodged when assembling the ue greasing the seal will aid assembly Twin pipe can also be converted back to Coaxial ue to enable vertical termin...

Страница 22: ...ducts 2 If you need to insert elbows in the air intake and exhaust gas ducts you should consider for each one the equivalent length to be included in the calculation of developed length 3 The exhaust...

Страница 23: ...S2 Air intake and ue gas exhaust unequal lengths FLUE TYPE Maximum Extension Exhaust air m Diameter of pipe mm EGIS HE 24 30 Coaxial System C13 C33 C43 10 10 60 100 B33 10 10 C13 C33 C43 25 25 80 125...

Страница 24: ...l isolation of the appliance by use of a fused double pole isolator having a contact separation of at least 3mm in all poles or alternatively by means of a 3A fused three pin plug and unswitched shutt...

Страница 25: ...sensor wires Loosen the cable clamp using a screwdriver and insert the wires leading from the outdoor sensor one at a time Connect the wires to the terminals as indicated in the gure below Make sure...

Страница 26: ...clock blanking plate or existing clock if tting the RF receiver in a product with an existing mechanical clock from the front control panel of the boiler Using the 4 securing screws supplied with the...

Страница 27: ...exchanger D H W flow switch Switch ON OFF Outdoor sensor Underfloor heating thermostat Room Thermostat 1 CN14 CN3 1 1 CN8 CN9 1 1 CN25 1 Display Rd Rd Bl Bl Br Bk Gry Bk Bl 1 CN6 HV connection N N FLA...

Страница 28: ...leaks discovered IMPORTANT MANUALLY VENT THE HEAT EXCHANGER AT THE MANUAL AIR VENT FAILURE TO VENT ADEQUATELY MAY DAMAGE THE HEAT EXCHANGER PAGE 7 LEGEND 4 4 1 3 Filling of the DHW System Close all ho...

Страница 29: ...n the pump Complete 9 Purge the air by pressing the Mode button for 5 sec Complete 10 Set the heating power See section 4 5 1 Complete 11 Balance the central heating circuit Complete 12 Check operatio...

Страница 30: ...minutes See below If you need to stop it press the ESC button alternatively it is possible to manually vent the heat exchanger At the end check that the system is completely deaerated and if not repea...

Страница 31: ...e temperature of the water coming out of the boiler may be more than 65 C The following icon appears on the display gas boiler activated at the C H maximum power Press the button to select the icon D...

Страница 32: ...3 parameter 1 Maximum Heating Power adjustment submenu 2 parameter 0 Soft light Ignition submenu 3 parameter 5 Heating ignition delay 4 5 1 Maximum Heating Power adjustment The maximum heating power c...

Страница 33: ...13 16 Maximum central heating fan speed 234 93 94 Maximum D H W fan speed 232 93 94 Maximum heating power adjstment 231 70 60 Gas valve restrictor NO NO Gas ow max min 15 C 1013 mbar nat m3 h GPL kg h...

Страница 34: ...ure indicating the operational assembly is followed by a P warning and the code relating to the speci c warning Important If this shutdown occurs frequently contact an authorised Technical Service Cen...

Страница 35: ...pump will continue to run for a maximum of 20 minutes unless a temperature above 9 C is detected in the central heating ow after this the the burner will re heating position until a temperature of 30...

Страница 36: ...of parameters value Programming ESC key to exit from the parameters The information relating to the parameters are indicated on the display Caution The menus reserved for quali ed technicians may only...

Страница 37: ...int 0 254 Post circulation and post ventilation after domestic hot water is drawn 0 OFF 1 ON 0 OFF 3 minutes post circulation and post ventilation after domestic hot water draw off if the boiler tempe...

Страница 38: ...the or buttons but the display will always show 7 to 7 High temperature each step 2 C Low temperature each step 1 C 425 Maximum Central Heating Temperature Zone 1 from 35 to 85 C Param 420 1 82 from 2...

Страница 39: ...again Check the settings and make sure all the command adjustment and monitoring parts are working correctly Check the ue system is sealed and operating correctly 7 3 Draining procedures The heating...

Страница 40: ...8 1 1 General Access Tools TIME 3 min Remove the two screws under the boiler 1 Pull the casing forwards and unhook it from the upper pins 2 Lower the electrical front panel 3 Remove the combustion cha...

Страница 41: ...e 8 2 ELECTRICAL UNIT 8 2 1 Control box access Tools TIME 4 min Remove the front panel as above and pivot the electrical box 1 Unhook the two clip and rotate the cover 2 3 Unscrew the two screws and r...

Страница 42: ...de 8 2 2 Fuse Tools TIME 5 min Open the control box as above 1 Remove the fuse 2 3 8 2 3 Main P C B Tools TIME 5 min After opening the control box disconnect the elctrical plug connections 1 Unhook an...

Страница 43: ...43 8 maintenance guide 8 2 4 Display P C B Tools TIME 5 min Unscrews the four screws and pull the assembly towards you 1 Disconnect the elctrical plug connections unhook and remove the P C B 2...

Страница 44: ...ntral heating lter 8 D H W ow switch assembly 9 Central Heating return 10 Cold water inlet D H W 11 C H drain valve 8 3 2 3 Way valve unit Tools TIME 5 min Unplug the diverter valve cable 1 Remove the...

Страница 45: ...he boiler 1 8 3 4 Automatic air vent Tools TIME 5 min Drain the boiler see 3 3 Remove the clip and lift the AAV from the assembly 1 2 8 3 5 Primary water pressure sensor Tools TIME 5 min Drain the boi...

Страница 46: ...Pump Tools TIME 10 min Drain the boiler see 3 3 Remove the clip and the two screws 1 Disconnect the pipe and then move the pump to the right to disengage 2 Remove the pump 3 Remove the sensor see 3 5...

Страница 47: ...s TIME 10 min Drain the boiler see 3 3 Remove the clip and pull the ow switch assembly towards you 1 Twist the ow switch assembly to disengage 2 8 3 7 C H Filter Tools TIME 5 min Drain the boiler see...

Страница 48: ...0 min Drain primary and domestic hot water circuits Remove the two screws and remove the heat exchanger 1 2 8 3 9 LEFT HAND HYDRAULIC BLOCK ASSEMBLY Legend 1 Left hand hydraulic block 2 By pass assemb...

Страница 49: ...trap Tools TIME 5 min Unscrew the condensate trap from the condensate body 1 8 3 12 Safety valve Tools TIME 5 min Drain the boiler see 3 3 Disconnect the discharge pipe Remove the st clip on the left...

Страница 50: ...pass assembly Tools TIME 5 min Drain the boiler see 3 3 Remove the second clip and pull the assembly towards you 1 2 3 8 3 14 Temperature sensors Tools TIME 5 min NTC1 Black NTC2 Red 1 Unplug the ele...

Страница 51: ...15 Overheat thermostat Tools TIME 5 min Remove the electrical connections Unscrew the screw nad remove the overheat thermostat 1 Remove the clip and the temperature sensor 3 IMPORTANT Do not use cond...

Страница 52: ...TIME 25 min Drain boiler see 3 3 Unscrew the screws of ue collector 1 Disconnect the condensate discharge pipe from the ue collector 2 Remove the ignitor Disconnect the electrical connectios 3 Remove...

Страница 53: ...maintenance guide Remove the silencer Disconnect the gas pipe from the mixer Remove the fan electrical connection Unscrews the two screws Remove the fan mixer group Unscrews the six screws of the bur...

Страница 54: ...54 8 maintenance guide Remove the burner Remove the clips to disconnect the ow and return pipes Unscrew the screws of the main exchanger Remove the main heat exchanger...

Страница 55: ...55 8 maintenance guide 8 4 COMBUSTION GROUP 1 4 5 6 7 9 8 3 Legend 1 Fan 3 Mixer 4 Silencer 5 Gasket Fan 6 Detection electrode 7 Ignition electrode 8 Burner 9 Burner gasket...

Страница 56: ...guide 8 4 1 Spark generator Tools TIME 5 min Remove the electrical connections from the spark genera tor and unhook it 1 8 4 2 Electrodes Tools TIME 5 min Unscrews the four screws 1 Pull the electrod...

Страница 57: ...TIME 15 min Remove the combustion assembly see 4 3 1 Remove the three screws to free the fan 2 Legend 1 Fan 2 Venturi 3 Gasket Fan mixer venturi according to the model Power Fan Venturi diameter 24 kW...

Страница 58: ...lve Tools TIME 15 min Remove the two screws under the boiler and disconnect the gas pipe on the left of the gas valve 1 Remove the gas valve 2 Legend 1 Gas valve 2 Solenoids 3 Throttle adjustment 4 Of...

Страница 59: ...ually How Visual inspection Clean as necessary Flow switch operation Maintenance Interval Annually How Visual inspection Clean as necessary Check ow rate Expansion vessel Maintenance Interval Annually...

Страница 60: ...lean as necessary Condensate trap Maintenance Interval Annually or after cleaning primary heat exchanger How Visual inspection Clean as necessary Add water before replacing Pump Maintenance Interval A...

Страница 61: ...ffect the customer s statutory rights If yes and if required by the manufacturer has a water scale reducer been tted CONDENSING BOILERS ONLY The condensate drain has been installed in accordance with...

Страница 62: ...er Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone No Gas Safe Register No Comments Signature Date Engineer Name Company Name Telephone...

Страница 63: ......

Страница 64: ...10462500 Ariston Thermo UK Ltd Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Internet www ariston co uk Technical Advice 0333 240 7777 Customer Service 0333 240...

Отзывы: