37
1
15. Fitting the casing
M
N
R
A
Fitting the casing
Remove the protective film on the casing;
- Locate the lower clips into the slots in the chassis;
- Engage hooks
N
on the casing in notches
R
on the side panels
M
(Fig. 45);
- Close the panel mounting clamps (Fig. 45);
- Screw in the clamp locking bolt
A;
Note: it is essential to refit the locking bolt A
C
e
n
tr
a
l
H
e
a
ti
n
g
O
u
tp
u
t
(k
W
)
24 kW 30 kW
0
12
3
4
56
78
9
10
Steps (Value P min - P max - Menu 4)
10
12
14
16
18
20
22
24
26
28
30
10
12.5
15
17.5
20
22.5
25
27.5
30
32.5
35
8
9.6
11.2
12.8
14.4
16
17.6
19.2
20.8
22.4
24
35 kW
Fig. 44
Fig. 45
14. Commissioning and testing
(continued)
Содержание COMBI A 24 MFFI
Страница 19: ...19 1 2 A A Fig 14 Fig 16 Fig 13 11 Installing the Boiler continued Fig 15 P P ...
Страница 22: ...22 Fig 21 Fig 22 Fig 23 ...
Страница 31: ...31 WIRING DIAGRAM FOR CONNECTION TO AN OPEN VENTED CYLINDER DIAGRAM B ...
Страница 32: ...32 WIRING DIAGRAM FOR CONNECTION TO AN MTS UNVENTED CYLINDER DIAGRAM A ...
Страница 61: ...61 24 Benchmark Commissioning Checklist ...
Страница 62: ...62 25 Service Interval Record ...
Страница 63: ...63 ...