57
MAINTENANCE GUIDE
4.3 BURNER
Tools
Time
15 min
1
Isolate the gas supply. Remove the four screws and disconnect the
gas pipe from the gas valve
Pull the assembly towards you
2
Remove the three screws to free the burner door
Pull the burner toward you
Replace any gaskets that are
damaged or showing signs of
deterioration
1. Stainless Steel Burner
. Ignition electrode
3. Detection electrode
Power
Length
Venturi
1 kW
73.4 mm
ø
4 mm
18 kW
73.4 mm
ø
4 mm
4 kW
104.6 mm
ø
4 mm
30 kW
135.8 mm
/
1
2
3
Length
Содержание CLAS HE R 12
Страница 32: ...32 installation S Plan system utilizing integral 2 channel programmer and Ariston unvented hot water cylinder ...
Страница 33: ...33 installation Y Plan system utilizing external 2 channel programmer ...
Страница 34: ...34 installation Y Plan system utilizing integral 2 channel programmer ...