![Arista DCS-7504 Скачать руководство пользователя страница 3](http://html.mh-extra.com/html/arista/dcs-7504/dcs-7504_quick-start-manual_2970784003.webp)
Quick Start Guide: 7500 Series Modular Data Center Switches
iii
Table of Contents
Chapter 1
Overview.............................................................................................................1
1.1
Scope...................................................................................................................................................... 1
1.2
Receiving and Inspecting the Equipment................................................................................................ 1
1.3
Installation Process................................................................................................................................. 1
1.4
Safety Information................................................................................................................................... 2
1.5
Obtaining Technical Assistance.............................................................................................................. 2
1.6
Specifications.......................................................................................................................................... 3
Chapter 2
Preparation.........................................................................................................5
2.1
Site Selection .......................................................................................................................................... 5
2.2
Tools and Parts Required for Installation................................................................................................ 6
2.3
Electrostatic Discharge (ESD) Precautions ............................................................................................ 7
Chapter 3
Rack Mounting the Switch ................................................................................9
3.1
Two-Post Rack Mount............................................................................................................................. 9
3.1.1
Attaching Mounting Brackets to the Chassis ............................................................................. 9
3.1.2
Inserting the Switch into the Rack............................................................................................ 10
3.2
Four-Post Rack Mount .......................................................................................................................... 11
3.2.1
Assembling the Shelf ............................................................................................................... 11
3.2.2
Inserting the Switch into the Rack............................................................................................ 15
Chapter 4
Cabling the Switch...........................................................................................17
4.1
Cabling the AC Power Supply............................................................................................................... 17
4.1.1
Grounding the Switch............................................................................................................... 17
4.1.2
Connecting Power Cables to an AC Power Supply ................................................................. 18
4.2
Connecting Supervisor Cables ............................................................................................................. 20
4.3
Connecting Line Card Modules and Cables ......................................................................................... 21
Chapter 5
Configuring the Switch ...................................................................................23
Appendix A
Status Indicators ...........................................................................................25
A.1
Supervisor Module ................................................................................................................................ 25
A.1.1
Supervisor Indicators: 7508/7504 ............................................................................................ 25
A.1.2
Supervisor Indicators: 7508E / 7504E ..................................................................................... 26
A.2
Line Card Module Indicators ................................................................................................................. 27
A.3
Fan and Fabric Status Indicators .......................................................................................................... 28
Содержание DCS-7504
Страница 8: ...4 Quick Start Guide 7500 Series Modular Data Center Switches Specifications Chapter 1 Overview ...
Страница 40: ...36 Quick Start Guide 7500 Series Modular Data Center Switches Appendix C Front Panel ...
Страница 44: ...40 Quick Start Guide 7500 Series Modular Data Center Switches Appendix D Rear Panel ...