![ARI Eliptix R-30ME Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/ari/eliptix-r-30me/eliptix-r-30me_installation-operating-maintenance_2969554007.webp)
R-30 ME
2. INSTALLATION
2.1. Pre installation requisites
1.
Important: Before performing any work on the valve make sure that all workers on site are familiar with the safety
instructions and the relevant local and general safety instructions and work regulations.
2.
Before installing the valve, flush the pipeline to remove scale, dirt and other particles that might affect the valve
performance.
3.
Carefully remove the valve from the shipping package. Unload all valves carefully to a sturdy and leveled surface
taking care not to drop them.
4.
Valves fitted with hoist rings should only be lifted and conveyed using these hoist rings.
5.
It is recommended that the valve be easily accessible and clearly marked to prevent damage.
Содержание Eliptix R-30ME
Страница 18: ...R 30 ME 7 DIMENSIONAL DRAWING...
Страница 19: ...R 30 ME 8 SOLENOIDS DATASHEETS...
Страница 20: ...R 30 ME...