ARI Eliptix R-30ME Скачать руководство пользователя страница 13

R-30 ME 

 

 

 

 

 

 

 

 

5. TROUBLESHOOTING 

 

 

Problem 

Cause 

Check 

Solution 

Valve does not open 

1.

 

The inlet pressure is 
too low 

1.

 

Check the inlet 
pressure 

1.

 

 Make sure water supply and/or 
pump is on. 

2.

 

The 

3

-Way selector 

(

3

) is set to "close". 

2.

 

Check the position of 
the 

3

-way selector (

3

2.

 

 Turn the 

3

-Way selector (

3

) to 

"Auto". 

3.

 

Blocked pilot 

3.

 

No water is coming 
out through the 
pilot's #

2

 port. 

3.

 

 Contact  A.R.I.’s field service 

Valve does not close 

1.

 

Debris on the sealing 
seat 

1.

 

The valve is constantly 
discharging small 
amount of water 

1.

 

 Turn the 

3

-way selector (

3

) to 

"open" for 5 seconds, and then to 
"close". 
If the problem continues, turn off 
the water supply to the valve.  
Remove the bonnet and 
diaphragm, remove the foreign 
object, and check that the 
diaphragm, body and cover are not 
damaged. 

2.

 

The Diaphragm is 
damaged 

2.

 

Constant flow 
through the solenoid 
(

4

) vent, when valve is 

set to open 

2.

 

 Turn off the water supply to the 
valve.  Remove the bonnet and 
replace the diaphragm. 

Valve does not respond 
to remote command 

1.

 

The Solenoid's 
manual override lever 
(

5

) is turned. 

1.

 

Solenoid manual 
override lever (

5

position 

2.

 

1

. Turn the solenoid manual override 

lever to its "Auto" position. 

2.

 

Controller 
malfunction 

2

. Touch the solenoid 

while command is 
given; movement 
should be felt.  

2

.  See the controller's user manual. 

3.

 

Solenoid malfunction 

3

. Manually opening and 

closing the valve  

3

. Replace the solenoid. 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание Eliptix R-30ME

Страница 1: ...ydraulic control valves The valves are suitable for installation in agriculture water transmission and waterworks systems for irrigation landscape and infrastructure applications The R 30 series has a...

Страница 2: ...tial Set up The Pressure Reducing Application 10 3 OPERATION INSTRUCTIONS 11 4 MAINTENANCE 12 4 1 Periodic Inspection 12 4 2 Storing the valve 12 5 TROUBLESHOOTING 13 6 DISMANTLING AND ASSEMBLING THE...

Страница 3: ...ever whether caused by accessing and or relying upon this Disclaimer and or in any document enclosed hereto including without limitation any links procedures or materials A R I shall NOT assume any li...

Страница 4: ...prior warning Make sure that allproducts outlet portsarenotdirectedtowardelectricalelements pumps orpeople 8 Always open and close valves slowly and gradually 9 Please note that the maximum working pr...

Страница 5: ...lations set for handling this type of fluid 3 Before disconnecting the product from the system and before releasing the residual pressure do NOT loosen or unscrew the product bolts removeanyprotection...

Страница 6: ...ns 2 Make sure that all the tools ladders lifting devices etc used during the maintenance procedures are taken away from the product area and stored 3 Remove grease and fat material residues in order...

Страница 7: ...2 Before installing the valve flush the pipeline to remove scale dirt and other particles that might affect the valve performance 3 Carefully remove the valve from the shipping package Unload all val...

Страница 8: ...lve it is recommended to install the following valves Isolation valves upstream and downstream of the control valve 2 2A Air valves upstream and downstream of the control valve 5 3 Close the 3 way sel...

Страница 9: ...fittings if necessary 4 For Normally Open Valve Energize the solenoid 4 use the PLC s or the Controller s HMI screen 5 Turn the 3 way selector 3 to its AUTO position 6 For Normally Open Valve De ener...

Страница 10: ...ergized water from the valve s upstream port flows into the control chamber and the valve closes When the solenoid is de energized water from the control chamber is released to the atmosphere and the...

Страница 11: ...To manually open the valve turn the manual 3 way selector 3 to its OPEN position To manually close the valve turn the manual 3 way selector 3 to its CLOSE 2 To maintain downstream preset pressure open...

Страница 12: ...tenance 4 1 Periodic Inspection 1 Every 6 months visually inspect the valve s diaphragm for any tears 2 Every 12 months inspect the valve s operation and clean the Finger Filter 3 Check the downstream...

Страница 13: ...the problem continues turn off the water supply to the valve Remove the bonnet and diaphragm remove the foreign object and check that the diaphragm body and cover are not damaged 2 The Diaphragm is d...

Страница 14: ...d ring at the other 20 mm spanner open at one end and ring at the other 24 mm spanner open at one end and ring at the other 2 Release Pressure Make sure that the water supply to the valve is switched...

Страница 15: ...Disassembling the valve 1 Using a 24mm spanner release the 4 bolts of the valve s bonnet in a diagonal manner A D 2 Un screw the bonnet s bolts E F and remove the bonnet from the valve s body G H 1 1...

Страница 16: ...the valve s diaphragm K L 6 4 Cleaning the Finger Filter 1 Disassemble and clean the finger filter using a 20mm spanner release the upstream 2 way manual valve A B Then using a 19mm spanner release th...

Страница 17: ...nd tightened in all directions parallel to the valve s body 6 6 Reassembling the Control loop 1 Make sure that all the control loop components are in good condition and clean 2 Clean the control tubin...

Страница 18: ...R 30 ME 7 DIMENSIONAL DRAWING...

Страница 19: ...R 30 ME 8 SOLENOIDS DATASHEETS...

Страница 20: ...R 30 ME...

Страница 21: ...le nor does this warranty extended to any consequential or incidental damages or expenses of any kind or nature regardless of the nature thereof including without limitation injury to persons or prope...

Отзывы: