![Argus TreeQinetic Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/argus/treeqinetic/treeqinetic_manual_2969462016.webp)
TreeQinetic
©
www.argus-electronic.de
16
5.3.
Zero-setting
After mounting the devices on the tree a zero-calibration must be performed.
The zero-calibration can be done by operating the buttons on the device or via the PC software.
Zero setting on the device:
1. Mount des device.
a. Inclinometers: Try to level the Inclinometer approximately horizontal.
b. Elastometers: Look the device mechanically while mounting. Release look after it is
fixed
c. Forcemeter: mount the Forcemeter while the cable is loose.
2. Turn on the device
3.
Press (OK) button shortly. Display shows „Adjust zero position“ and „Adjust“
4. Make sure the device is well mounted.
5. Press (OK) to proceed.
6. Zero calibration is performed after 5 seconds.
Alternatively the zero-calibration can be done via the PC
– software. All devices are zero-calibrated
at the same time when the software commando is sent.
The Inclinometers do have a temperature drift. For best results expose the inclinometers to the
ambient temperatur
e as soon as you arrive on the site. Use “set-to-zero” function before every pull!
5.4.
Calibration
The devices are calibrated at delivery and do usually not require an additional calibration.
If the calibration values have been changed the devices need to be sent back to argus electronic.
Calibration can only be done by argus electronic gmbh in Rostock.