A
Assembly Instructions
6
Step
5
Only follow Steps 4 and 5 if you are fitting 2 hanging rails.
If you are just fitting 1 rail, follow Step 2 and 3.
B
B
K
1
Finished
front edge
Prepare the right end
Refer to step 1 and,
if
you have chosen to fit 2
hanging rails
, screw 2
metal dowels into the
right end .
Note:
Tighten the metal
dowels up fully against
the panels.
To fit the 2 rail holders
screw through the top
hole with screw and
into the shallow mark
hole drilled in the right
end . Make sure that
they are fitted straight, in
line with the panel edges
and then fit another
screw using the lower
hole.
B
K
J
J
1
1
J
K
J
K
B
K
Step
6
Prepare the fixed shelf
Tap 2 wooden dowels
into the fixed shelf .
Note:
Wooden dowels
must not
stick out from
the edge by more than
10mm or they may
damage other panels.
Insert 4 large locking
nuts into the fixed
shelf .
Note:
The arrow on the
locking nut
must
point
towards the hole in the
edge of the panel.
A
C
3
3
C
C
C
C
C
3
Finished
front edge
A
10mm
A