
8
E-119 TRI 233A: 6. Frame Inspection
Parts installed on the frame Description
Screw Torque Detail
type Nm
1
Front derailleur hanger
Screw (2)
5mm
4Nm
Loctite
2
Rear derailleur hanger
Screw (2)
3mm 4Nm Loctite
3
Bottle cage
Screw (5)
4mm 3Nm Grease
4
Bottom bracket cover
Screw (2)
4mm 2.5Nm Grease
5
Brake arms pivot (front / rear) Screw (2)
6mm 7Nm Loctite
6
Front brake cap
Screw (2)
4mm 2.5Nm Grease
7
Rear brake cap
Screw (2)
4mm 5Nm Grease
IMPORTANT:
The following parts are assembled on the frame. When assembling the bike, you will need to adjust these parts according to their
torque specifications.
BEFORE ASSEMBLING YOUR NEW E-119 TRI, MAKE SURE THAT YOU HAVE ALL THE FOLLOWING:
1. Brakes and gears cables and housing set
2: Frameset parts checklist (see p.44)
3: Inspect the frame for cosmetic aspect (scratches, bumps, cracks, paint defect, etc.)
4: For reference, check serial number and write it on p.1
5: All the necessary bolts (refer to Frameset Parts, p.4)
6: For optimal shifting performance, use a dropout alignment gauge to make sure that the drive-side dropout is
straight