9
7. Frame Inspection
Parts installed on the frame Description
Screw Torque Detail
type Nm
Front derailleur hanger
Screw (2)
5mm
4Nm Threadlocker
Rear derailleur hanger
Screw (1)
4mm
2Nm Threadlocker
Bottle cage
Screw (4)
5mm 3Nm Grease
Bottom bracket cover
Screw (2)
4mm 2.5Nm Grease
IMPORTANT:
The following parts are assembled on the frame. When assembling the bike, you will need to adjust these parts according to their
torque specifications.
BEFORE ASSEMBLING YOUR NEW E-117 TRI DISC, MAKE SURE THAT YOU HAVE ALL THE FOLLOWING:
1. Brakes hoses, gears cables and housing set
2: Frameset parts checklist (see p.5)
3: All the necessary bolts (refer to Frameset Parts, p.5)
WHEN ASSEMBLING YOUR NEW E-117 TRI DISC, MAKE SURE YOU FOLLOW THIS PROCEDURE:
4: Inspect the frame for cosmetic aspect (scratches, bumps, cracks, paint defect, etc.)
5: For reference, check serial number and write it on p.2
6: For optimal shifting performance, use a dropout alignment gauge to make sure that the drive-side dropout is straight.