Argo AT0623 Скачать руководство пользователя страница 16

16

Problem

Cause

Solution

No heat when called by 

thermostat and “TT” LED 

is NOT lit

Thermostat

Disconnect thermostat from control, momentarily place a jumper across 

terminal “TT” & “TT.” If circulator starts, trouble is in thermostat.

No power to board

Confirm control’s On/Off switch is in “ON” position, check 15A circuit 

breaker or fuse. 

“Circ” LED is NOT lit 

when thermostat is call-

ing

Safety fault

Check for open contact on safety’s. Confirm continuity across terminals. 

No power to board

Confirm control’s On/Off switch is in “ON” position 

“Safety Switch” LED is 

NOT lit when thermostat 

is calling

Safety fault

Check for open contact on safety’s. Confirm continuity across terminals. 

No power to board

Confirm control’s On/Off switch is in “ON” position.

“FAULT” LED is flashing

Safety fault

Refer to “Fault” codes

TrouBLEsHooTing

!

  

WARNING

Take extreme care when boiler cover is 

removed. Turn “OFF” all service to boiler. 

"Power On” checks should be made by 

qualified electrician.

Heating element change, use following procedure:

Check water pressure of boiler. Should be 15-25 PSIg.

1. 

Check for air within system.

2. 

This section is to assist service technician when 
trouble shooting electric boiler. It is important to 
isolate before proceeding. Control error codes can be 
helpful identifying cause of problem. If you suspect 
wiring fault, check all external wiring and wiring 
connections following wiring diagram label on inside 
of boiler's cover. Additional wiring diagram is included 
with this manual.

Turn off hydronic unit circuit breaker at service en-

1. 

trance and/or disconnect switch.

Close gate valves near inlet and outlet of hydronic 

2. 

block.

noisy BoiLEr

HEATing ELEmEnT cHAngE

When thermostat calls for heat, circulator will be 

8. 

energized and indicator LED will light. Heating elements 
are energized with element indicator LEDs. Once boiler 
water temperature reaches set point on temperature 
adjustment dial, controller will regulate boiler by 
staging its elements. Number of elements which stay 
on is based on heating demand and set point of boiler 
water temperature. After all room thermostats are 

satisfied with heat, controller de-energizes elements 

one after another, and switches pump off after 3 
minutes

.

THErmosTAT insTALLATion

 

3. 

Close feed line valve if using automatic fill.

Open drain valve and allow water to drain from boiler. 

4. 

Manual operation of relief valve will assist drainage by 

allowing air to enter.

Remove cabinet cover and disconnect two wires 

5. 

attached to effected heating element.

Remove four bolts securing heating element to casting 

6. 

pry element loose. Take note of markings on element 

flange to assure proper reinstallation.

After element has been removed, carefully clean any 

7. 

remaining gasket material from casting surface. Take 

care not to scratch or score surface.

Install new gasket and heating element while assuring 

8. 

element is correctly positioned.

Close relief valve. Open feed line valve and check for 

9. 

leaks. Open gate valves. Install heating element wires 

and cabinet cover.

Refer to "Startup and Seasonal Maintenance" for proper 

10. 

purging of air prior to energizing heating elements.

Содержание AT0623

Страница 1: ...n and specifications outlined in this manual in effect at the time of printing of this manual ECR International reserves the right to discontinue change specifications or system design at any time wit...

Страница 2: ...NUAL NEAR BOILER RETAIN FOR FUTURE REFERENCE NOTICE Owner Installation and service of this boiler must be performed by qualified installer Installer Leave all instructions with the boiler for future r...

Страница 3: ...nversion process requires no combustion boiler operates with highest possible efficiency Electric Hydronic Block is constructed with cast iron boiler that conforms to American Society of Mechanical En...

Страница 4: ...t Boiler Recommended Wire AT0623 6 208 4 507 15 400 21 7 3 000 2 6 27 7 34 6 35 0 8 10 10 AT0824 8 208 6 009 20 500 28 9 4 000 2 6 34 9 43 6 45 0 6 8 8 AT1025 10 208 7 511 25 600 36 1 5 000 2 6 42 1 5...

Страница 5: ...ting brackets for easy wall mounting Use of lag screws or anchor bolts through holes provided or on 3 4 plywood panel On uneven walls suggested mounting surface be provided such as two 2 x 4 s Surface...

Страница 6: ...p supply may be located in this area below Circulator pump should be installed on supply side pumping away 6 Install gate valves at locations shown in Figures 2 3 so any boiler servicing requiring rem...

Страница 7: ...7 primary secondary piping for Multiple zoning with ZONE VALVES primary secondary piping for Multiple zoning with circulators PRIMary secondary piping figure 2 figure 3...

Страница 8: ...e ends before inserting into terminal block Tighten terminal screws Do not use pump rated greater than 5 amps Thermostat Connect thermostat or zone valve end switch to terminals TT and TT Figure 4 Do...

Страница 9: ...re sizes specified conform to Canadian Electrical Code Canada or National Electric Code USA and include derating for ampacity and temperature Use copper wire only Check state and local requirements Re...

Страница 10: ...or will continue to be energized for 3 minutes to purge boiler After 3 minutes control will de energize circulator Circ LED turns off If during start up or during operation safety end switch opens its...

Страница 11: ...TACT SEC 120 VOLT WIRING POSE DES C BLES 120 VOLT 240 VOLT WIRING POSE DES C BLES 240 VOLT 120 VOLT FIELD WIRING POSE DES C BLES 120 VOLT SUR EN CHANTIER 240 VOLT FIELD WIRING POSE DES C BLES 240 VOLT...

Страница 12: ...HERS SOURCE DU COURANT 120V 60HZ 1PH OU AUTRES OPTIONAL FLOW SWITCH BY OTHERS INTERRUPTEUR DE D BIT FACULTATIF OU AUTRES THERMOSTAT BY OTHERS THERMOSTAT OU AUTRES ELEMENT 1 L MENT No1 ELEMENT 1 RELAYS...

Страница 13: ...T BLK BLANC NOIR WHT BLANC FUSE BLOCK BLOC DE FUSIBLE BLK NOIR L2 L1 POWER BLOCK BLOC DE PUISSANCE 240 VOLT FIELD WIRING POSE DES C BLES 240 VOLT EN CHANTIER EN CHANTIER 120 VOLT WIRING POSE DES C BLE...

Страница 14: ...NOIR WHT BLANC RED ROUGE WIRE LEGEND L GENDE DES FILS DRY CONTACT WIRING POSE DES C BLES DE CONTACT SEC 120 VOLT WIRING POSE DES C BLES 120 VOLT 240 VOLT WIRING POSE DES C BLES 240 VOLT 120 VOLT FIELD...

Страница 15: ...as the pressure remains less than 25 PSIG Hydronic block is now ready to be put into service Verify hydronic block circuit breaker or switch at service 1 entrance and depending on option hydronic blo...

Страница 16: ...cluded with this manual Turn off hydronic unit circuit breaker at service en 1 trance and or disconnect switch Close gate valves near inlet and outlet of hydronic 2 block noisy boiler heating element...

Страница 17: ...rly routed to suitable container or drain Manually operate pressure relief valve by pulling lever at end of valve until lever is in line with center line of valve Figure 9 Close valve to avoid losing...

Страница 18: ...erature Pressure Gauge C57 Pressure Vessel Cast Iron 2 Element Z302A Control Panel Assembly 2 Element Complete 2 Element Electric Boiler w Power Block Item Part Number Description 1 S47 Safety Limit C...

Страница 19: ...t Z304A Control Panel Assembly 4 Element Complete 4 Element Electric Boiler w Power Block Item Part Number Description 1 S47 Safety Limit Control High Limit Fixed Temp 2 G12 Gasket Heating Element 3 E...

Страница 20: ...LATOR PUMP 120 VAC PRIMARY TT TT C1 C2 SINGLE ZONE WITH CIRCULATOR 2 BOILERS ONE SINGLE ZONE NOTE ABOVE NUMBERS REFER TO NUMBER DESIGNATIONS ON RELAY BASE 9 13 14 12 5 1 RELAY RELAY BASE 4 8 DIN RAIL...

Страница 21: ...O ZONES WITH CIRCULATORS 2 BOILERS NOTE IF CONTROL ONLY CONTAINS ONE ISOLATED END SWITCH PLEASE CONTACT TECHNICAL SERVICE FOR PROPER INSTALLATION AT BOILER CIR CIRCULATOR PUMP 120 VAC PRIMARY TT TT C1...

Страница 22: ...ONE VALVE ZONE VALVE ZONE VALVE THERMOSTATS THREE ZONES WITH CONTROL VALVES AT BOILER C1 C2 CIR CIRCULATOR PUMP 120 VAC TT TT PRIMARY X X ZONE 1 ZONE 2 TR TW SWITCH ISOLATED THERMOSTAT SPST 2 WIRE ARG...

Страница 23: ...6 7 7 8 2 2 42 2 2 6 6 02 3352 4 0 2 452 5 02 3352 2 6 6 0 0 4 7 4 2 2 05 0 6 6 7 7 8 7 3500 9 2 6 6 6 6 80 3 4 2 3 0 2 4 2 54 4 2 6 4 7 7 7 7 6 6 6 6 6 6 6 6 4 4 7 6 6 6 6 4 5 2 2 0 0 2 5 4 2 05 0 6...

Страница 24: ...LED should come on with the jumper installed OK OK Lights come on with jumper and elements then energize Replace circuit breaker or power block depending on type of boiler Check service at main load...

Страница 25: ...ler and the output of all boiler circuit breakers 240vac not present 240vac present Replace circuit breakers Yes No Is there an increase in temperature 240vac not present Verify that 240vac is pres en...

Страница 26: ...audible alarm flashing pulsing twice Stuck welded element relay contact Replace electric boiler control board RTD short Follow steps on page 10 to check RTD and replace if necessary RTD open Follow st...

Страница 27: ...ry Yes Potentially bad low water cut off Check wiring to LWCO and consult LWCO manufacturer if necessary No Check pump and flow rate of system Pump may require replacement Does visual audible alarm sh...

Страница 28: ...______________________________ ___________________________________________________________ Telephone Number ___________________________________________ After Hours Number _____________________________...

Отзывы: