Chap.4 - Procedure
Procedure for pressure generator models CH1-125B and CH2-125B
> Hydraulic diagram
>
Pressure mounted
> Observe the maximum operating pressures
of the pressure generator
Maximum operating pressure : CH1-125B
125 bar and CH2-125B
125 bar
a)
Connect the instrument to be tested
b)
Check the valve
A
is open
c)
Check the capstan
1
the pressure generator is in end position stop.
d)
Close the valve
A
, turn the capstan
1
in the direction of clockwise : you can build up pressure up to
120 bar (Maximum operating pressure : 150 bar)
e)
Make the measurement point.
>
Reduce pressure
f)
After the readings measures, turn the capstan
1
in the opposite direction clockwise until the
end position of the stop and slowly open the valve
A
g)
The instruments can be disassembled.
Содержание CH1-1250B
Страница 2: ...RE ENR 110 Rév B le 15 03 2014 page 2 ...
Страница 4: ...RE ENR 110 Rév B le 15 03 2014 page 4 ...
Страница 18: ...RE ENR 110 Rév B le 15 03 2014 page 18 Notes ...
Страница 19: ...RE ENR 110 Rév B le 15 03 2014 page 19 Notes ...
Страница 20: ...RE ENR 110 Rév B le 15 03 2014 page 20 ...