Maintenance procedures
Liite 2 (13)
13
Securing the high voltage connectors
1. Remove the High Voltage Disconnect.
2. Open the right side panel.
3. Make sure that the orange high voltage connectors are properly in place and
the locks are engaged.
4. The smaller connectors have a three stage lock. To remove release the first
clip. Press the orange button and pull the connector. Press the black button and
pull the connector.
5. To install push the connector to the socket. Lock the clip by pushing it.
6. The larger connector is locked when the locking lever is parallel with the
cords.
Содержание eSled CSC 2015
Страница 29: ...Liite 1 3 9 1 eSled CSC 2015 Operator s manual 26...
Страница 38: ...Liite 1 12 12 Kuvio 3 Suositeltu tunnistehierarkiarakenne tavallisessa kokoonpanossa...
Страница 44: ...Liite 1 18 18 Kuvio 6 Esimerkki Akuston datalehti...
Страница 46: ...Liite 1 20 20 Kuvio 7 Esimerkki vaatimusm ritys...
Страница 53: ...Liite 2 0 eSled CSC 2015 Operator s manual ARCTIC POWER 11 16 2015 Version 0_5_0...
Страница 78: ...Liite 2 25...