Figure. 5.2.2. - 19. Nominal voltage injection to the IED by using secondary test equipment. Voltage transformer scaling is set to
20000:100 V. Voltage measurement mode is 3LN+U4 and U4 channel is measuring zero sequence voltage which has same ratio
20000:100 V.
Figure. 5.2.2. - 20. Voltage injection during earth fault to the IED by using secondary test equipment. Voltage transformer scaling
is set to 20000:100 V. Voltage measurement mode is 3LN+U4 and U4 channel is measuring zero sequence voltage which has
same ratio 20000:100 V.
Troubleshooting
It is possible that for some reason the measured voltages may not be as expected. For these cases
following checks may be helpful.
Problem
Check / Resolution
Measured voltage amplitude in all phases does not
match for what is injected.
Scaling settings or voltage measurement mode may be wrong, check
from
Measurement
→
Transformers
→
VT Module
that the settings
match for what is expected.
Measured voltage amplitude does not match for one
measured phase or calculated U0 is measured when
there should not be any.
Wiring connections from injection device or VT:s to the IED.
AQ-F255
Instruction manual
Version: 2.00
© Arcteq Relays Ltd
30