BW
S175 Simple Install Guide
12
If a water supply to downstream
equipment is immediately
needed, the storage tank can be
quickly filled.
v
Place in Service
Step 13
OPEN the Feed Suppy Valve and check for
leaks. Allow time for the tank to fill before
using connected equipment (this could take 30
minutes to several hours depending on the
tank capacity).
Step 13
v
Quick Tank Fill
Open Bypass
Simply OPEN the Bypass Valve and un-filtered
water will flow directly into the storage tank.
When the tank is full, or a desired level is
reached, CLOSE the Bypass Valve. The system is
now in normal operating mode and the
optimized water will
flow to the tank.
IMPORTANT: Do not leave the system in
bypass. This could result in damage to the
downstream equipment.