BWS1500 Simple Install Guide
19
v
Adjust the Blend TDS
Allow the system to continue to operate in
normal service mode (filling the Storage Tank),
with the Buffer Tank Valve closed.
Step 15a
Turn on power to Water Quality Monitor.
Press the OUT button. This indicates the TDS
of the water exiting the membrane. Enter on
the
Post Installation Checklist
.
Step 15b
Press the IN button. This indicates the TDS of
the Optimized Water flowing to the Storage
Tank.
Step 15c
Adjust the Blending Valve to 80 ppm (or to
user-required TDS).
Step 15d
Make single-turn adjustments, waiting 30
seconds between, until TDS is at desired level.
Step 15e
After 5 minutes, re-check the TDS IN and
make final adjustments if necessary.
Power button
OUT button
IN button
Blending Valve
80 ppm
Содержание OptiPure BWS1500
Страница 1: ......
Страница 13: ...BWS1500 Simple Install Guide 13 v System Start Up System connections completed ready for start up ...
Страница 20: ......