![AquaShield Aqua-Swirl Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/aquashield/aqua-swirl/aqua-swirl_inspection-and-maintenance-manual_2960935012.webp)
© AquaShield
TM
, Inc. 2016. All rights reserved.
Aqua-Swirl
®
TABULAR MAINTENANCE SCHEDULE
Date Construction Started:
Date Construction Ended:
During Construction
Month
Activity
1
2
3
4
5
6
7
8
9
10
11
12
Inspect and Clean
as needed
X
X
X
X
Inspect Bypass and
maintain as needed
X
X
X
X
Clean System*
X*
* The Aqua-Swirl
®
should be cleaned
once a year
regardless of whether it has reached full pollutant storage
capacity. In addition, the system should be cleaned at the
end of construction
regardless of whether it has reach full
pollutant storage capacity.
First Year Post-Construction
Month
Activity
1
2
3
4
5
6
7
8
9
10
11
12
Inspect and Clean
as needed
X
X
X
X
Inspect Bypass and
maintain as needed
X
X
X
X
Clean System*
X*
* The Aqua-Swirl
®
should be cleaned
once a year
regardless of whether it has reached full pollutant storage
capacity.
Second and Subsequent Years Post-Construction
Month
Activity
1
2
3
4
5
6
7
8
9
10
11
12
Inspect and Clean
as needed
X*
Inspect Bypass,
maintain as needed
X*
Clean System*
X*
* If the Aqua-Swirl
®
did
not
reach full sediment or floatable pollutant capacity in the First Year Post-Construction
period, the system can be inspected and cleaned once annually.
If the Aqua-Swirl
®
reached
full sediment or floatable pollutant capacity in less than 12 months in the First Year
Post-Construction period, the system should be inspected once every six (6) months or more frequently if past
history warrants, and cleaned as needed. The Aqua-Swirl
®
should be cleaned annually regardless of whether it
reaches its full sediment or floatable pollutant capacity.