© AquaShield
TM
, Inc. 2016. All rights reserved.
If the Aqua-Swirl
®
reached full sediment or floatable pollutant capacity in less than 12
months in the First Year Post-Construction period, the system should be inspected once
every six (6) months and cleaned as needed. The Aqua-Swirl
®
should be cleaned annually
regardless of whether it reaches its sediment or floatable pollutant capacity.
IV.
Bypass Structures
Bypass structures should be inspected whenever the Aqua-Swirl
®
is inspected.
Maintenance should be performed on bypass structures as needed.
MAINTENANCE COMPANY INFORMATION
Company Name:
Street Address:
City:
State/Prov.:
Zip/Postal Code:
Contact:
Title:
Office Phone:
Cell Phone:
ACTIVITY LOG
Date of Cleaning:
(Next inspection should be 3 months from
this data for first year).
Time of Cleaning:
Start:
End:
Date of Next Inspection:
Floatable debris present:
Yes
No
Notes:
Oil present:
Yes
No
Oil depth (inches):
Measurement method and notes:
STRUCTURAL CONDITIONS and OBSERVATIONS