55
INSTALLATION STEPS
Prepare Rhino Tank
Wrap your pipe nipples with NSF certified
plumber's tape. Connect the nipples to the
system's inlet and outlet.
NOTE: DO NOT use pipe
solvent (dope), as solvents
in some types of pipe dope
may cause damage to plastic
fittings. Do not over-tighten to
prevent damage to filter head.
3
When installing on metallic plumbing,
ensure you take the following
precautions. Securely install two (2)
grounding clamps and a #4 copper
wire (not included) across the
location where the system will be
installed. Tightly clamp at both
ends, as shown in the illustration.
Ground
Clamp
Ground
Clamp
Ground
Wire
WARNING
ELECTRICAL SHOCK HAZARD
Prior to installation on metallic plumbing, securely install two grounding clamps and a #4 copper wire
per installation instructions. Failure to follow these instructions can result in death or electric shock.
4
COPPER PIPES ONLY (proceed to Step 5 for PVC Pipes)
Install Shut-off Valve and Ensure Spacing
(Cont. on next page)
1. Using a pipe cutter, cut into the main water supply line to install the
shut-off valve.
2. Loosely fit shut-off valve to calculate proper spacing of components.
3. Measure distance for Pre-Filter, Rhino tank, and optional add-ons
(Salt-Free Conditioner and UV) and mark pipe accordingly.
If you're installing additional add-ons make sure to read through
those separate installation manuals prior to fully installing your
complete system.
5