background image

 

 

8.  This unit also can be used in new and existing ponds and is 

an ideal way to add color to a waterfall.  For existing ponds 
with a waterfall simply re-plumb the tube/pipe that discharges 
into the existing waterfall and place the lit spillway at the top 
of the waterfall insuring that the unit is level.  Carefully cover 
the housing with natural material for a professional look.  For 
new ponds and waterfalls, this unit will take the place of a 
weir allowing for a much simpler and more natural looking 
waterfall installation.  Fig. 8 

                                                                                                       
 
                   

 

Fig. 8 

 

9.  Cut the stone that goes on the top of the spillway before building 

the next layer of stones. Or use a retaining wall block cap in place 
of the cut and add an inch of roofing shingles under the spillway.  
Fig. 9 

 

NOTE:  The thickness of the weir is approximately 1”.  You can cut 

several pieces of stone to make this fit.                                                                                                                                    

                                                                                                                          

                                                                                                                                   
   

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

Fig. 9 
 

10. Route the power cord of the pump through the hole in the tub and 

then route the tubing through the same hole.  Fig. 10 

  
 

 

                                                                                                     
 
                   

 

 

        

Fig. 10 

 

11. Remove the front screen from the pump and connect the prefilter to 

the front of the pump.  Fig. 11 

 
 
 
 
                                                                                                     
 
                   

 

 

          Fig. 11 
 
 
 
 
 
 
 

 

  

 

 

Pump 

Weir 

Tubing 

Содержание QDLS12B

Страница 1: ...before installation and or maintenance Replace the entire light transformer assembly if damage is found CAUTION Use a proper power source as indicated on the transformer label Keep the cord away from...

Страница 2: ...TRUCTIONS 1 Select a level location to build the Lit Waterfall kit Begin building the kit by placing the tub on the ground and building the stones around it It is very important that the stones are le...

Страница 3: ...alling with this kit using connection a is preferred For other installs use b Fig 5 6 Tighten the hose clamp using a flathead screwdriver Fig 6 Fig 6 7 Place the spillway onto the wall Then continue b...

Страница 4: ...ng for a much simpler and more natural looking waterfall installation Fig 8 Fig 8 9 Cut the stone that goes on the top of the spillway before building the next layer of stones Or use a retaining wall...

Страница 5: ...3 Fig 13 14 Connect the spillway to the transformer by pushing the plug into the transformer socket until it is firmly seated Hand tighten the nut from the plug to the socket Fig 14 Fig 14 15 Plug the...

Страница 6: ...clean the inside of the spillway We recommend using a 10 long brush approximately 1 thick or any brush that will fit inside the front of the spillway opening TROUBLESHOOTING If the light fails to ill...

Страница 7: ...products or parts subject to this warranty For products damaged in transit a claim should be filed with the carrier Disclaimer Any oral statements made about the product by the seller the manufacturer...

Отзывы: