PREPARATION
Before beginning assembly or operation of product, make sure all parts are present. Compare parts with
package contents list and diagram above. If any part is missing or damaged, do not attempt to assemble,
install or operate the product. Contact customer service for replacement parts.
•
Estimated Assembly Time: 1.5 hours
•
Tools required for assembly: hammer, chisel, flathead screwdriver.
•
The instructions that follow will show a block wall and pond installation. Your lighted waterfall can be
used in a variety of applications.
OPERATION INSTRUCTIONS
1. Select a level location to build the Lit Waterfall kit. Begin building
the kit by placing the tub on the ground and building the stones
around it. It is very important that the stones are level, so be sure
to check that the structure is level from front to back as well as left
to right. Fig. 1
Fig. 1
2. The two stones in the picture need to be cut in order to fit the half
round tub. The pump power cord and tubing will fit through this
hole. Fig. 2
Fig. 2
3. HINT: To assist with keeping the wall plumb, place a layer of
roofing shingles along the back wall on this layer. This will keep the
wall from leaning back due to the lip of the tub. Fig. 3
Fig. 3
4. For maximum water flow, cut the adapter as shown using a
hacksaw. Fig. 4
Fig. 4
Cut ring