5.17
INST
ALLA
TION
Pressurised Sampling Points - Samplers
incorporating The Pressurised Pipeline Interface (PPI)
The Sampler is supplied with 2 intake hoses; a standard 10 Metre
length Intake Hose, with a fixing Flange fitted to one end, to connect
from the Sampling Point, to the PPI, and a Short Hose to connect
from the PPI to the Sampler Module.
Installation Procedure:
1. Couple the 1/2" BSP Tapered Male Fitting at the Sampling Point
End of the 10 Metre Intake Hose to the pre-installed Pipeline
Tapping Point (Use PTFE tape to seal the joint).
2. Run the Intake Hose along its designated path to the Pressurised
Pipeline Interface Intake. (The 16mm Hose Tail Fitting, protruding
from the right hand side of the Pressurised Pipeline Interface
Enclosure)
3. Cut the Intake Hose to length so that it is able to engage with the
Pressurised Pipeline Interface Intake (Allow about 30mm of hose
to engage with the 16mm Hose Tail Fitting).
4. Place the Intake Hose Clip supplied over the PPI end of the Intake
Hose and soften the end of the hose by the application of heat
using a hot air gun
5. Push the hose onto the PPI Intake Hose Connector so that
approximately 30mm is engaged and secure in place by tightening
the Intake Hose Clip, using a screwdriver.
6. Place the other Intake Hose Clip supplied over the PPI end of the
Short Hose (the plain end) and soften the end of the hose by the
application of heat using a hot air gun.
7. Push the hose onto the PPI Outlet Hose Connector so that
approximately 30mm is engaged and secure in place by tightening
the Inlet Hose Clip, using a screwdriver.
8. Connect the other end of the Short Hose to the Intake Pipe on the
Sampler Module.
Note:
S300 Series Samplers – The Short Hose is pre-installed, so
ignore 6. onwards, above.
Содержание Aquacell S100
Страница 1: ...Aquamatic Stationary Wastewater Samplers User Guide Issue 5 03...
Страница 2: ......
Страница 30: ...2 8 INTRODUCTION...
Страница 58: ...4 24 PREPARING THE SITE...
Страница 158: ...MAINTENANCE 7 18...
Страница 160: ...TECHNICAL SPECIFICATION 8 2...
Страница 161: ...TECHNICAL SPECIFICATION 8 3...