4.21
PREP
ARING
THE
SITE
PPI Location
A wall or similar flat surface is required, on which to mount the PPI
cabinet. The PPI should be positioned according to the Installation
Drawing above
Gravity Drain Installation
Construct the drain from 56mm O/D plastic pipe. The drain should be
coupled to the PPI Drain Outlet and should lead to a suitable disposal
point. It may be possible to couple the PPI drain into the Wastewater
Drain (if one is fitted), however care must be taken in configuring the
drain to avoid any backflushing issues
Installing the Pressure Tapping
A suitable tapping point should be made and fitted with a hand
operated Isolation Valve. The Pressure Tapping should be terminated
in a 1/2" BSP femail fitting, to which the PPI intake Hose can be
connected.
Electrical Power Supply Installation
A suitable electrical supply should be provided for the PPI - see
TECHNICAL SPECIFICATION, (page 8.6) which is terminated in a
switched fused isolator, fused as indicated on the PPI Rating Label.
The isolator should be mounted conveniently close to the PPI Power
Input Cable Gland.
Содержание Aquacell S100
Страница 1: ...Aquamatic Stationary Wastewater Samplers User Guide Issue 5 03...
Страница 2: ......
Страница 30: ...2 8 INTRODUCTION...
Страница 58: ...4 24 PREPARING THE SITE...
Страница 158: ...MAINTENANCE 7 18...
Страница 160: ...TECHNICAL SPECIFICATION 8 2...
Страница 161: ...TECHNICAL SPECIFICATION 8 3...