Lighting Control Delay
Hydromate 20
-
Lighting Controls
6.
If you wish to control the local lighting, connect switch wire
‘
line
’
feed into light-
ing connectors and set to desired
‘
lights
-
on time
’
(The Hydromate will turn on
the lights on detection)
7.
Carefully refit the fascia and secure with 4 screws provided.
230v Supply, L,N,E
Valve Connection E,N,L
Lighting Sw/wire
connection—in/out
Remote P.I.R
Additional PIR can also be
connected here if required
(optional extra)
All Switches off =
1min
Sw1 on adds 2 mins
Sw2 on adds 4 mins
Sw3 on adds 8 mins
Sw4 on adds 16 mins
1,2,3 on (up) = 15
minutes
Lights on
time delay
Reprogramming & Care
1.
Should you require to increase or decrease flush frequencies, simply adjust the
rotary switch to desired program number. No further programming is required.
2.
To alter the fill time you must reset the system —
stage 3.
3.
In case of a power failure, the unit
’
s memory will retain programmed settings.
NB: Unexpected interruptions or pressure differentials with your water supply may
cause fill times to drift over time.
For further information or Technical assistance contact us on:
Tel 0844 324 0844 or Email: info@aqualogic
-
wc.com
Fill Button
Remote PIR
Additional PIR for lighting ONLY
(optional extra
)
can be connected here.