background image

Lighting Control Delay

 

Hydromate 20 

-

 Lighting Controls

 

6.

 

If you wish to control the local lighting, connect switch wire 

line

’ 

feed into light-

ing connectors and set to desired 

lights

-

on time

’ 

(The Hydromate will turn on 

the lights on detection)

 

7.

 

Carefully refit the fascia and secure with 4 screws provided. 

 

230v Supply, L,N,E

 

Valve Connection E,N,L

 

Lighting Sw/wire 

connection—in/out

 

Remote P.I.R 

 

Additional PIR can also be 

connected here if required 

(optional extra)

 

All Switches off = 

1min

 

Sw1 on adds 2 mins

 

Sw2 on adds 4 mins

 

Sw3 on adds 8 mins

 

Sw4 on adds 16 mins

 

1,2,3 on (up) = 15 

minutes

 

Lights on 

time delay

 

Reprogramming & Care

 

1.

 

Should  you  require  to  increase  or  decrease  flush  frequencies,  simply  adjust  the 

rotary switch to desired program number. No further programming is required.

 

2.

 

To alter the fill time you must reset the system —

 

stage 3.

 

3.

 

In case of a power failure, the unit

s memory will retain programmed settings. 

 

 

NB:  Unexpected  interruptions  or  pressure  differentials  with  your  water  supply  may 

cause fill times to drift over time. 

 

 

 

For further information or Technical assistance contact us on: 

 

Tel 0844 324 0844  or Email: info@aqualogic

-

wc.com 

 

Fill Button

 

Remote PIR 

 

Additional PIR for lighting ONLY 

(optional extra

can be connected here.

 

Отзывы: