background image

AQUHM20 1.2

 

HydroMate 20

 

Installation & Setup

 

Instructions

 

Please check your box has the following contents

 

You will require the following

:

 

1mm twin & earth flex

 

Cable Clips, Trunking or Conduit

 

20mm Cable glands, wall or ceiling 

 

fixing Screws/plugs. 

 

1 x Hydromate control standard surface mount 

box.

 

1 x 15mm 230v Solenoid Valve.

 

   

     URINAL CONTROL SYSTEMS 

Recommended:

 

15mm  isolation valve 

AQRIV

” 

(To comply with water regulations)  

 

230v Supply from fused spur using 3 amp fuse (BS1361)

 

A wiring junction box 

-

If connecting more than 1 valve to control unit

 

 

Отзывы: