Introduction

The Quartz Thermo is designed for both built-in and concealed panel mount installation and is supplied complete with

adjustable height head. Quartz Thermo provides close temperature stability and fail safe protection when installed on

approved gravity or pumped systems and balanced high pressure systems. 

A cold inlet flow regulator is provided for use with instantaneous (multipoint) gas water heater and combination boiler applications.

If you have any questions at any stage during installation please contact the Aqualisa customer helpline on 01959 560010.

Safety information

This product must be installed by a competent person in accordance with all relevant current Water Supply Regulations.

Quartz Thermo is designed for domestic use only.

Flushing

Some modern fluxes can be extremely corrosive and, if left in contact, will attack the working parts of this unit. All soldering

must be completed and the pipe work thoroughly flushed out in accordance with current Water Supply Regulations prior to

connection of the pro duct.

Connections

The Quartz Thermo valve incorporates ‘push fit’ type connections for use with 15mm British Standard copper tube. Tube

should be cut using a rotary type cutter and lubricated using a silicone based lubricant or petroleum jelly (Vaseline or similar)

prior to insertion into the fitting. Supply lines must be flushed clear of any debris before installation of the unit.

If plastic pipe is to be used, the tube insert must not increase the tube diameter or extend the cut off length by more than 2mm.

THESE FITTINGS ARE NOT SUITABLE FOR STAINLESS STEEL TUBE

Isolating valves

Suitable isolation valves such as gate valves must be fitted to both supplies in accordance with the current Water Supply

Regulations and our terms of warranty.

Due to their restrictive characteristics, stopcocks and ball type valves that reduce the pipe bore size must not be used on gravity

or pumped installations.

Filters

To ensure ongoing optimum performance the internal control

mechanism ‘cartridge’ is protected by a two-part filter system.

Debris accumulation may result in reduced flow from the shower

head and noisy operation.

As this condition is not covered by our standard warranty terms, it is

suggested that the cartridge be removed and the filters checked by

a competent person. In the event of any difficulties please contact

the Aqualisa customer helpline for assistance.

Siting

For optimum performance, with gravity fed systems, the distance between the bottom of the storage cistern and the shower

head should not be less than 1m (when using an adjustable height shower kit). If using a fixed head, the highest point of the

pipe work must be not less than 1m below the underside of the cistern. Please refer to the system layouts on page 15 

For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - [email protected] 0844 556 1818   

Содержание Quartz Thermo QZ3111

Страница 1: ...artz Thermo installation guide page 1 Quartz Thermo Concealed shower valve with adjustable head For latest prices and delivery to your door visit MyTub Ltd www mytub co uk info mytub co uk 0844 556 18...

Страница 2: ...allation guide page 2 Shower systems Quartz Thermo built in shower valve with adjustable head QZ3111 Components For latest prices and delivery to your door visit MyTub Ltd www mytub co uk info mytub c...

Страница 3: ...insertion into the fitting Supply lines must be flushed clear of any debris before installation of the unit If plastic pipe is to be used the tube insert must not increase the tube diameter or extend...

Страница 4: ...POOR SHOWER PERFORMANCE To minimise pressure loss we recommend that the hot and cold supplies are run in 22mm as close as reasonably possible to the mixing valve before reducing to 15mm A typical lay...

Страница 5: ...mbly if fitted from the valve by carefully pulling the assembly away from the valve a screw is provided in the screwpack to secure the on off lever assembly to the valve towards the end of installatio...

Страница 6: ...supplied in its own pack 7 The Quartz Thermo valve is supplied with an outlet cap on the bottom of the valve allowing for a top outlet connection The bottom outlet can be used by simply removing the c...

Страница 7: ...e elbows push home the supply pipes ensuring the correct orientation for the inlet pipes HOT LEFT AND COLD RIGHT AS SHOWN ON THE VALVE BODY Push the valve fully home until a definite stop is reached t...

Страница 8: ...roove on the rear of the wall plate and carefully push the wall plate into position flush with the wall 19 Depress the maximum temperature stop button and replace the temperature lever onto the valve...

Страница 9: ...tter If a hacksaw is used the pipe end must be carefully de burred and chamfered 2 Clean and lubricate the pipe using a suitable silicone based lubricant 3 Remove the wall outlet cover plate and caref...

Страница 10: ...allowed to pass a point 25mm above the spill over level of the bath or shower tray If this cannot be achieved the hose must be passed through the gel hook which has also been designed to be utilised...

Страница 11: ...fter passing it through the gel hook hose restraint if required and run the shower for 15 seconds without the handset attached to clear any internal debris which may be present 14 For latest prices an...

Страница 12: ...surfaces is avoided Remove the temperature control lever screws and pull the temperature lever clear 5 Carefully remove the lilac pre set override ring and re set in the appropriate direction to incre...

Страница 13: ...cassette clockwise or anti clock wise To select the preferred height for the shower head depress the handset holder levers fully to enable the slider to be moved up or down the rail Angular adjustment...

Страница 14: ...poor and water temperature is low Airlock in the water supply Check that the pipe work is laid in accordance with the correct practices paying particular attention to potential air traps Water temper...

Страница 15: ...re reducing valve if required Supply Vent and draw off pipe to hot water Underside of cistern Highest point must be 1m below underside of cistern Hot water cylinder Connect A or B Cold feed to cylinde...

Страница 16: ...0800 652 3669 Website www aqualisa co uk Email enquiries aqualisa co uk Please note that calls may be recorded for training and quality purposes The company reserves the right to alter change or modi...

Отзывы: