Aqualisa Quartz Thermo QZ3111 Скачать руководство пользователя страница 4

Quartz Thermo 

installation guide

page 4

Important information

Pump installation

UNDER NO CIRCUMSTANCES MUST A PUMP BE FITTED DIRECTLY TO THE WATER MAIN.

A pump must only be used to boost the pressure from tank-fed supplies. A typical layout is shown on the reverse of this guide.

Stored water capacities

The minimum capacity of the cold storage cistern should not be less than 225 litres (50 gallons). The capacity of the hot

cylinder must be capable of meeting the anticipated demand.

Pressures

The Quartz Thermo shower valve is designed to control static pressure up to 10 bar. Where pressures are likely to exceed 10

bar, a pressure reducing valve (PRV) must be fitted into the incoming mains supply. A setting of 3 bar is recommended. It

should be noted that daytime pressures approaching 8 bar can rise above the stated maximum overnight.

Quartz Thermo is not suitable for mixed supply systems e.g. gravity hot and mains cold.

A suitable PRV is available from Aqualisa.

Gravity fed hot and cold supplies

Services must be installed according to good plumbing practice having regard to pipe sizing, long pipe runs and low-head

situations.

The cold supply for the valve assembly must be taken directly from the cold storage system. The hot supply may be taken from

the vent/draw off pipe of the hot water cylinder at a point below the cylinder connection or alternatively from the underside of

the horizontal draw off.

Rising pipe work must not be connected into the horizontal draw-off from the cylinder or to any point in the vent/draw off pipe

above the cylinder connection.

CYLINDER TEMPERATURE IN EXCESS OF 65ºC MAY RESULT IN POOR SHOWER PERFORMANCE.

To minimise pressure loss we recommend that the hot and cold supplies are run in 22mm as close as reasonably possible to the

mixing valve before reducing to 15mm. 

A typical layout is shown oon page 15.

Combination boiler/multipoint system

The gas water heater must be capable of raising the temperature of the incoming water by 35˚C and delivering a flow rate of

no less than 9 litres (2 gallons) per minute to the shower valve. This is sufficient to operate one outlet point at a time.

The Aqualisa Thermo cartridge is designed to operate from the mains at a maximum pressure of 10 bar. If the mains pressure

exceeds 10 bar a ‘drop tight’ PRV must be fitted on the supply pipe after the main stopcock.

The cold supply can be taken from the nearest convenient mains supply and the hot supply can be taken from the nearest 

hot water draw-off point. Account must  be taken of the pressure drops that will occur when other draw-off points are used

while the shower is in use. Pipe work can generally be run in 15mm. 

A typical layout is shown oon page 15.

Balanced high-pressure system 

The Aqualisa Thermo cartridge is designed to operate with unvented hot water 

storage systems up to a maximum pressure

of 10 bar. A PRV must be used if either supply exceeds 10 bar. The cold water supply must be drawn from the same mains

supply as that to the hot water system (down stream of the cylinder manufacturers pressure limiting valve, where supplied)

and the hot supply from the nearest convenient draw off point. Account must be taken of pressure drops that may  occur when

other draw-off points are used while the shower is in use.Pipe work can generally be run in 15mm.

A typical layout is shown oon page 15.

For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - [email protected] 0844 556 1818   

Содержание Quartz Thermo QZ3111

Страница 1: ...artz Thermo installation guide page 1 Quartz Thermo Concealed shower valve with adjustable head For latest prices and delivery to your door visit MyTub Ltd www mytub co uk info mytub co uk 0844 556 18...

Страница 2: ...allation guide page 2 Shower systems Quartz Thermo built in shower valve with adjustable head QZ3111 Components For latest prices and delivery to your door visit MyTub Ltd www mytub co uk info mytub c...

Страница 3: ...insertion into the fitting Supply lines must be flushed clear of any debris before installation of the unit If plastic pipe is to be used the tube insert must not increase the tube diameter or extend...

Страница 4: ...POOR SHOWER PERFORMANCE To minimise pressure loss we recommend that the hot and cold supplies are run in 22mm as close as reasonably possible to the mixing valve before reducing to 15mm A typical lay...

Страница 5: ...mbly if fitted from the valve by carefully pulling the assembly away from the valve a screw is provided in the screwpack to secure the on off lever assembly to the valve towards the end of installatio...

Страница 6: ...supplied in its own pack 7 The Quartz Thermo valve is supplied with an outlet cap on the bottom of the valve allowing for a top outlet connection The bottom outlet can be used by simply removing the c...

Страница 7: ...e elbows push home the supply pipes ensuring the correct orientation for the inlet pipes HOT LEFT AND COLD RIGHT AS SHOWN ON THE VALVE BODY Push the valve fully home until a definite stop is reached t...

Страница 8: ...roove on the rear of the wall plate and carefully push the wall plate into position flush with the wall 19 Depress the maximum temperature stop button and replace the temperature lever onto the valve...

Страница 9: ...tter If a hacksaw is used the pipe end must be carefully de burred and chamfered 2 Clean and lubricate the pipe using a suitable silicone based lubricant 3 Remove the wall outlet cover plate and caref...

Страница 10: ...allowed to pass a point 25mm above the spill over level of the bath or shower tray If this cannot be achieved the hose must be passed through the gel hook which has also been designed to be utilised...

Страница 11: ...fter passing it through the gel hook hose restraint if required and run the shower for 15 seconds without the handset attached to clear any internal debris which may be present 14 For latest prices an...

Страница 12: ...surfaces is avoided Remove the temperature control lever screws and pull the temperature lever clear 5 Carefully remove the lilac pre set override ring and re set in the appropriate direction to incre...

Страница 13: ...cassette clockwise or anti clock wise To select the preferred height for the shower head depress the handset holder levers fully to enable the slider to be moved up or down the rail Angular adjustment...

Страница 14: ...poor and water temperature is low Airlock in the water supply Check that the pipe work is laid in accordance with the correct practices paying particular attention to potential air traps Water temper...

Страница 15: ...re reducing valve if required Supply Vent and draw off pipe to hot water Underside of cistern Highest point must be 1m below underside of cistern Hot water cylinder Connect A or B Cold feed to cylinde...

Страница 16: ...0800 652 3669 Website www aqualisa co uk Email enquiries aqualisa co uk Please note that calls may be recorded for training and quality purposes The company reserves the right to alter change or modi...

Отзывы: