background image

HiQu Digital Bath

installation instructions

Page 11

Unscrew the single fixing on top of the

processor box and carefully tilt the lid up

and off the location lugs and pull the lid

clear.

16

Connect the processor power lead to a

double pole 3 amp fuse switched spur in-

corporated in the fixed wiring circuit,

in

accordance with current wiring rules. En-

sure that this is located in an

ac-

cessible, dry location and not in the

bathroom.

15

THIS APPLIANCE MUST BE EARTHED

We recommend protecting surface mounted cables in suitable ap-

proved conduit to avoid the risk of damage from vermin.

The data cable and power lead should also be clipped in place with ‘P’

clips or similar to avoid accidents.

!

Connect the low voltage data cable into

the socket adjacent to the temperature ad-

juster as indicated on the label.

Feed

the cable out of the processor box

en-

suring it is correctly routed within the data

cable channel.

17

A further data cable socket has been provided for use with a secondary

Digital remote start/stop controller. This can be accessed by carefully

snapping and removing the entry pillar and connecting the cable as de-

scribed above.

!

Содержание HiQu

Страница 1: ...HiQu Digital Bath installation instructions Page 1 HiQu Digital Bath Installation guide...

Страница 2: ...HiQu Digital Bath installation instructions Page 2 HiQu Digital Digital Bath HiQu Digital Bath...

Страница 3: ...Components HP Combi Literature not shown Literature not shown Components Gravity Pumped HiQu Digital Bath installation instructions Page 3...

Страница 4: ...rthed Cables which are chased into the wall must be protected by a suitably sized conduit or sheathing to allow for removal in the event of service and maintenance purposes Ensure that the conduit is...

Страница 5: ...n ended 2 5 bar pump should be used The minimum actual capacity of the cold water storage cistern should be not less than 225 litres 50 gallons The capacity of the hot water cylinder must be capable o...

Страница 6: ...t is essential that the written in structions overleaf are read and understood and that you have all the necessary components shown overleaf before com mencing installation The HiQu Digital Bath syste...

Страница 7: ...indicate direction of flow Compression fittings should not be used on the inlet and outlet spigots and may affect warranty if fitted Choose the position for your Digital processor as close to the bath...

Страница 8: ...y pipes 5 The maximum hot water inlet temperature must be no more than 65 C Attach the supply pipes to the Digital processor ensuring that the cold and hot feeds are fitted into the appropriately mark...

Страница 9: ...set aside 8 Place the bath control back plate onto the finished wall surface in the desired location and mark the fixing and data cable entry points 9 Connect the data cable to the rear of the control...

Страница 10: ...BEFORE ANY ELECTRICAL ADJUSTMENT IS ATTEMPTED THE ELECTRICITY SUPPLY MUST BE TURNED OFF AT THE MAINS SWITCH ELECTRICAL INSTALLATION MAY ONLY BE CARRIED OUT BY A QUALIFIED PERSON Connect the outlet pi...

Страница 11: ...recommend protecting surface mounted cables in suitable ap proved conduit to avoid the risk of damage from vermin The data cable and power lead should also be clipped in place with P clips or similar...

Страница 12: ...N BOILER SYSTEMS For Standard Digital processors installed on combi boiler systems for op timum performance we recommend setting the flow rate to the COMBI mode 18 N B The ECO flow rate mode should no...

Страница 13: ...t bladed screwdriver using the MAX TEMP ADJUSTMENT control as indicated When the temperature has been set to the desired position carefully replace the Digi tal processor lid and secure the fixing han...

Страница 14: ...purposes The company reserves the right to alter change or modify the product specifications without prior warning Registered Trademark Aqualisa Products Limited The Waste Electrical and Electronic E...

Отзывы: