Page - 29
Figure 4
1. Deactivate power to heat pump.
2. Remove heat pump electrical access panel.
3. Route 22-gauge (minimum), 2-conductor, low-voltage wires from the
controller to the low voltage side of the heat pump's electrical
enclosure. Follow all National Electric Codes (NEC) unless State or
Local guidelines supersede.
4. Connect the controller wires to the microprocessor port labeled "Ext
Controller" with the terminals labeled "Y" and "Z" as follows. See
Figure 4.
l
Connect one wire to “Y”.
l
Connect other wire to “Z”.
l
The polarity of the wire is not important.
5. Reattach heat pump access panel.
6. Apply power to heat pump.
7. Configure the heat pump to accept a 2-wire external controllers signal as shown. See "
Configure 2-wire controller
Enter "Installer Menus", then proceed
1
-
Ins
ta
ll
at
ion
Содержание Leisure Temp LT1000
Страница 2: ......
Страница 9: ...Page 6 1 3 Dimensions Leisure Temp LT55 Leisure Temp LT400 1 Installation...
Страница 10: ...Page 7 Leisure Temp LT600 Leisure Temp LT700 LT800 1 Installation...
Страница 15: ...Page 12 Leisure Temp LT55 Leisure Temp LT400 and LT600 Leisure Temp LT700 LT800 and LT1000 1 Installation...
Страница 26: ...Page 23 Configure Call Flex Enter Installer Menus then proceed 1 Installation...
Страница 30: ...Page 27 1 Installation...
Страница 33: ...Page 30 1 Installation...
Страница 36: ...Page 33 Configure for 24 Hour Mode Enter Installer Menus then proceed 1 Installation...
Страница 37: ...Page 34 Configure for Scheduled Mode Enter Installer Menus then proceed 1 Installation...
Страница 38: ...Page 35 1 Installation...
Страница 41: ...Page 38 1 Installation...
Страница 43: ...Page 40 1 Installation...
Страница 46: ...Page 43 1 Installation...
Страница 50: ...Page 47 1 Installation...
Страница 53: ...Page 50 1 Installation...
Страница 55: ...Page 52 1 Installation...
Страница 72: ......