Page - 32
Titanium ThermoLink
®
Exchanger (with no Drain)
No Drain
6. Disconnect the plumbing to the heat pump at connection unions (removal is counter-
clockwise).
7. Allow water to drain completely from the heat pump. Expect to see a lot of water drain out at
first, and then a small amount to continue to drain out over a long period.
8. After heat pump has fully drained, partially reconnect plumbing connection unions.
9. Winterizing is complete.
10. When ready to use the heat pump again, hand-tighten connection unions. Reconnect electrical
power, and set the operating mode on the heat pump. Activate the filter pump.
Titanium ThermoLink
®
Exchanger (with no Drain)
No Drain
6. Disconnect the plumbing to the heat pump at connection unions (removal is counter-
clockwise).
7. Allow water to drain completely from the heat pump. Expect to see a lot of water drain out at
first, and then a small amount to continue to drain out over a long period.
8. After heat pump has fully drained, partially reconnect plumbing connection unions.
9. Winterizing is complete.
10. When ready to use the heat pump again, hand-tighten connection unions. Reconnect electrical
power, and set the operating mode on the heat pump. Activate the filter pump.
2
-
M
ai
nt
ena
nc
e
Содержание HeatWave SuperQuiet SQ120R
Страница 2: ......
Страница 11: ...Page 8 1 Operation ...
Страница 13: ...Page 10 1 Operation ...
Страница 17: ...Page 14 Set Efficiency Mode to 24 Hour 1 Operation ...
Страница 18: ...Page 15 Set Efficiency Mode to Filtration Schedule 1 Operation ...
Страница 19: ...Page 16 1 Operation ...
Страница 21: ...Page 18 Configure for Call mode 1 Operation ...
Страница 22: ...Page 19 Configure for Flex mode 1 Operation ...
Страница 53: ...Page 50 Model Number Example 4 Appendix ...
Страница 58: ......