SG-B SERIES STEAM GENERATOR
10 E005-28-10-12
118m m
(Fig-9)
(4)
Temperature probe installation: the temperature probe is installed inside the steam room at
approximately 1.2 to 1.5 meters high and away from the door. Use a
Φ
4mm screw fix it in place and
then connect to the wire from the controller.
temperature
sensor
Φ
4 scr ew
(Fig-10)
Installation for power supply and control cable
Confirm the correct voltage of power supply and wires.
Remove the knock out for the power cable entry and use a rubber grommet to protect the cable, connect to
the conductors to the correct terminals for single phase power supply use the copper bridge connectors,
for 3 phase supply remove them.