22
L0200390
EQUO SOFT
Rev.2.2
10/11/2015
CHECK OF PROPER HYDRAULIC INSTALLATION
Before you start using your softener is required to perform a manual regeneration without added
salt.
To unlock the valve you need to keep pushing on the arrows
and
for 5 seconds (spy
off).
To initiate a manual regeneration, with the unlock valve, press the button
Press again
to progress the various regeneration steps:
The phases are: Backwash, Aspirations Brine, Brine Recovery, Final washing.
During the first manual regeneration control the first two phases can be advanced.
While the step of Restoring Brine should be completed to check the filling of the water in the
salt tank.
Backwashing
Advance with
button
Brine suction countercurrent
Advance with
button
Re-entering water in the brine
tank
Wait for the phase.
Automatically advances
Final wash equicurrent
Advance with
button
Make sure that the motor has stopped running before pressing the button again.
The
button is also used to bring the valve in service mode during programming.
FILLING THE MAGAZINE OF SALE
Enter into the salt tank amount of salt appropriate to the level reached by the water fed into the
phase Restoring Brine. Do not pass the overflow level of the salt tank.