13
3. After the mast installation is completed, insert it into the side mast sleeve of the sail rig from
the bottom port and push it to the top of the sail rig.
THE CONNECTION INSTALLATION OF THE SAIL RIG AND HULL
1. Insert the assembled sail rig to the hole on the triangular head plate of the hull to the hole
position above the bottom splint to finish the installation of sail rig.
2. Boom connection installation
There are two segments of boom connection. Install them in turn.
Install the boom connection to the mast of the sail rig (as following pictures). Install the
end with C type buckle of the boom connection to the mast and push it to buckle it into
the mast. Use the standard magic stick belt of the sail rig to stick and fix it.
Содержание OP-277
Страница 1: ...USER MANUAL EN Inflatable Sailing Dinghy Aqua Marina Pioneer OP 277...
Страница 8: ...8 PRODUCT FEATURES...