15
5. Centre thwart installation
Insert the centre thwart through the hole position as shown in the picture. Central thwart should be
inserted into the waterproof bag. It is necessary to stick it tightly around the waterproof bag to prevent
water from entering. Installation is completed.
OAR ASSEMBLY
1. Join the two shafts of the oars together with the couplers and securely tighten the coupler
covers (Fig. 1).
NOTE:
Completely insert the shafts into the couplers to avoid damage.
2. Attach the oars to the rotation oarlocks and lock them into position (Fig. 2 and 3).
NOTE:
When the oars are not in use, insert the oars into the oar holders to avoid damage and loss.
Fig. 1
Fig. 2
Fig. 3
MAINTENANCE AND STORAGE
The boat is made of the highest quality materials and complies with ISO 6185 standard. By doing
improper modifications you could decrease its safety, endanger yourself or other users and void
limited warranty.
It is easy to keep this boat in good condition for many years.
Содержание OP-277
Страница 1: ...USER MANUAL EN Inflatable Sailing Dinghy Aqua Marina Pioneer OP 277...
Страница 8: ...8 PRODUCT FEATURES...