![Aqua Lung EBIS-3000 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/aqua-lung/ebis-3000/ebis-3000_user-manual_2958526023.webp)
23
PRE-DIVE INSPECTION
The Pre-Dive Inspection shall be performed on the EBIS prior to each use by
the personnel to whom the unit is assigned. Pre-Dive Inspection procedures are
as follows:
WARNING:
Strict compliance with Pre-Dive and Post-Dive Inspections
shall be adhered to by all personnel utilizing the EBIS. Any discrepancies
shall be reported immediately to maintenance personnel.
2.
Open the handwheel to pressurize the system, ensure the dial pressure
gauge reads in the
“GREEN ZONE”
(Fig. 26)
.
1.
Confirm the handwheel is closed and the system depressurized. Visually
inspect the entire system for any signs of damage or contamination.
3.
Briefly depress the purge button to ensure that sufficient airflow is provided
to clear the second stage of water. Put the second stage in your mouth and
slowly inhale, there must be enough air delivered for you to breathe easily
without noticeable resistance. Reinstall the second stage into the mouthpiece
cover when finished.
4.
Briefly press the inflator button to make sure airflow is unobstructed and stops
completely when the button is released.
5.
Refill the cylinder to its maximum capacity as marked when the Pre-Dive
Inspection is complete. Verify the dial pressure gauge reads within the
“GREEN
ZONE”
after it has been filled.
Figure 26
GREEN ZONE
GREEN ZONE
Содержание EBIS-3000
Страница 1: ...User s Manual Rev 04 17 EBIS 3000 4500 Emergency Breathing Inflation System...
Страница 30: ...30 EBIS 3000 4500 User s Manual NOTES...
Страница 31: ...31 NOTES...