Level switch position change from drum chamber to inlet chamber
.
Default situation: level switch in the far left opening, blind plug in the middle, cover switch on the far right. Take out the spray pipe first to have good access to
the level switch. Slide the level switch up in the mounting bracket to untighten the nut. Remove the nut from the level switch.
Take out the rubber plug from the housing and pull out the level switch connector. Push the connector through the rubber plug so it is free.
Remove the level switch from the drum chamber by taking the nut and connector through the mounting bracket.
Remove the blind plug from the middle and put it in the left opening.
Push the connector through the mounting bracket in the inlet chamber. Please keep in mind that the level switch must be rotated 180 degrees in regards to the
gravity position! Then put the nut over the connector and screw it on the level switch.
Push the connector through the opening and push it through the rubber plug. The small hole of the plug can be widened with a sharp knife to make this a
little easier. Put the plug in the middle opening.
Put the connectors together. Keep in mind to have the arrow symbols opposite to each other! Slide the level switch to the correct position and tighten the nut.
Keep in mind that the active position of the level switch (float goes upwards) must be lower than the top edge of the waste gutter! If the level switch is higher
than the waste gutter water will go over the gutter and will go to waste.
Содержание COMBI-DRUM
Страница 36: ...qu il soit libre rinçage ...