ADA Fixing Insert Installation (Commercial Applications)
1.
We recommend installation of the fi xing insert after the concrete has cured and you are ready to install the
lift into the anchor.
2. Place the main assembly in the anchor. DO NOT LIFT THE MAIN ASSEMBLY BY USING THE ELECTRIC RAM
AS A HANDLE. If the transport cart was ordered with the lift, it can be used effectively here. If not, use two
people.
3.
Mark the location for the fi xing anchor hole and remove the lift.
(see pg 4, FIGURE A)
4. Drill the hole with a 1 1/4 inch core drill or roto-hammer to a depth of about 4 1/2 inches.
5.
Clean the hole out and make sure it is dry. Thread the 1/2 inch bolt into the top of the PVC fi xing anchor
and test fi t to verify it can be mounted perpendicular. See Step 1 below.
6.
Using a two part construction epoxy, fi ll the hole approximately half full and carefully insert the PVC fi xing
anchor into the hole, twisting as you push down to evenly spread the epoxy.
7. Allow the epoxy to cure before securing the lift.
8. Re-install the lift into the anchor and using the 1/2 inch bolt and washer, carefully thread into the installed
anchor until snug. TO PREVENT BREAKING THE FIXING BRACKET, DO NOT OVERTIGHTEN!
DECK
MAIN ASSEMBLY
POST
ANCHOR
1/2" X 2"
HEX BOLT
1/2" FLAT
WASHER
STEP 1
5