Anchor Installation: New Construction or Retro-Fit

You may need to saw cut and remove a portion of an existing pool deck in order to achieve the 10 inch depth 

footing requirement.  Aqua Creek does NOT recommend a core drill installation for this lift.

To properly install this anchor, you will need to have a concrete footing comprised of 2500 psi concrete that is 

10 inches deep and 4 feet - 3 inches square and reinforced with rebar.  Refer to Figures A and B below.

If cutting into an existing pool deck, the rebar must be drilled and secured to the surrounding pool deck on 

three sides (do not secure into bond beam).  The centerline of the anchor should be no less than 9 inches from 

the edge of the footing.

NOTE: The anchor setback will vary depending on application and any options you choose for the lift.  16 inch 

setback is the minimum for ADA compliance however, given a typical 1 foot bond beam and the fact that the 

anchor should be no closer than 9 inches to the edge of your footing, 21 inches may be the closest you can 

achieve.  The chart below outlines the minimum and maximum anchor setback locations for the available op-

tions based on this premise.  Also, some attachments will de-rate the lifting capacity of the lift.  Refer to the 

attachment manual or spec sheet to check for changes in lifting capacites.

1.  Determine the location for the anchor based on the options you are ordering or think you may order in the 

future and set the anchor in place.  You may use a small mass of wet concrete to set the anchor in place.  

Use a level and string lines to make sure the anchor is perpendicular and will be fl ush with the top of the 

fi nished deck surface.

2.  Bond the anchor according to local code requirements using the bonding lug on the bottom of the anchor.  

Reference the National Electric Code (NEC) Article 680.26 for specifi cs on bonding.

3. 

Pour the concrete so that the top of the anchor will be fl ush with the FINISHED pool deck surface.

4.  Once the concrete has cured, the lift can be put into place.

ITEM NO.

OPTION

MIN

MAX

F-730RSA-S2

GURNEY

21”

32”

F-706RLSS

SLING SEAT

21”

24”

F-734RSA

SPINE BOARD

21”

34”

F-705-S2

WHEELCHAIR ADAPTER

21”

34”

4'-3"

2'-1 12 "

9"

MIN

1'-0"

MIN.

1'-9" MIN.

3'-0" MAX.

4'-3"

4'-3"

3"

CLR

8 12 "

10"

2"

CLR

EPOXY TOP MATT

TO EXISTING SLAB

(4" MIN. EMBED)

REVOLUTION

BRONZE ANCHOR

SLEEVE

4'-3" SQ. x 10" DEEP

CONC. FTG. W/5 - #5

E.W., TOP & BTM. &

#4 U BAR @ TOP

(SEE FIGURE B)

DECK

POOL

WALL

FIXING

ANCHOR

FIXING

ANCHOR

LOCKING-PIN

SLOT

2'-0"

2'-0"

1'-0"

FIGURE A

FIGURE B