GLOBE VALVES OS & Y - FORGED - ISO 15761/API 602/B16.34
Australian Pipeline Valve - Installation, Operation and Maintenance Manual
1
Introduction
3
Safety Information
4-5
Valve Identification
6
1.0 Installation
7-11
1.1
Installation positions
7
1.2
Preparation for installation
8
1.3
End connections
8-11
1.4
Post-installation procedures
11
2.0 Operation
11
3.0 Maintenance
12-17
3.1
Gland packing adjustment
12-13
3.2
Backseating
13-14
3.3
Packing replacement
14-15
3.4
Preventative maintenance and periodic inspections
15-16
3.5
Lubrication
16
3.6
Bonnet bolt tension
16
3.7
Periodic stroking
16-17
4.0 Extraordinary Repairs & Maintenance
17-26
4.1
Stem
17
4.2
Gland disassembly & replacement of stem packing
17-20
4.3
Bonnet disassembly & stem replacement/repair
20-22
4.4
Bonnet reassembly
22
I N D E X