APstorage Installation / User Manual
13
3. Installation
3.4.1 DC Wiring
Connect the DC cable to the PCS through the cable gland. As shown, connect wire + & - to Battery
connector.
Torque value
:
40lb.in
Battery
Wire+: Red/Orange
Wire-: Black
3.4.2 AC Wiring
3.4.2.1 Connect the grid AC cables to the PCS through the cable gland. As shown,connect wire L
and wire N to grid breaker, connect wire PE to the earth terminal Block.
Torque value
:
27lb.in
3. Installation
N-Blue; L-Brown; PE-Yellow&Green
NOTE:
Make sure connect the live wire to L, connect the neutral wire to N, otherwise the
precision of CT will be affected.
N L PE
GRID