19
9-1-2022
APQS.com
Lucey Deluxe Installation
Step 3: Install the Table Top for Deluxe Table
NOTE: If you are installing Quilt Path computerized system, Hydraulic Lift or
Overhead Lighting, go to those manuals before going forward.
Peel the paper backing off the table top bumpers (O). Press firmly into position as instructed in the next steps.
1.
Position 6 bumpers on the center
cross tube straddling the cross tube’s
center channel. The table top sections
will meet at the center cross tube.
2.
Stick 3 bumpers on each of the 4
remaining cross tubes. Put them on
one side of the cross tube’s center
channel or the other. Press into place.