Apollo 7500ETL Скачать руководство пользователя страница 22

22

22

5.

Activating the system: A momentary connection between activation inputs and ground
(GND) is how the system is activated. At the upper left and bottom right of the board
are terminals marked INP or INPUT. These terminals - when momentarily shorted to
ground (GND) - will open, stop and close the gate with each activation. The button on
the side of the box (swing gates ONLY) is connected to these terminals and may be
used  to  activate  the  gate  when  the  key  is  in  the  horizontal  position.  On  our  newest
boards there is an “OPERATE” button at the upper left area of the board that may be
used in the same manner.

6.

HARD SHUTDOWN: If the system has encountered an obstruction two times before
fully opening or closing – the HARD SHUTDOWN LED (upper right of board) will be-
gin  flashing –  indicating  a  Hard  Shutdown  situation.  Check  to  see  that  any  obstruc-
tions are removed from the gates path and then press the “HARD SHUTDOWN RE-
SET” button to restart the system.

7.

Left Hand / Right Hand Operation: All APOLLO Slide Gates are shipped from the fac-
tory wired to close to the left (when looking out of the property). It is suggested to in-
stall and adjust the operator as it comes from the factory – then re-wire the system if
necessary.  The  easiest  way  to  determine  if  your  system  requires  re-wiring  is  to  use
the  LED  Enable  button.  Once  the  LEDs  are  enabled,  the  OPEN  LIMIT  light  should
come on in the open position and the CLOSED LIMIT light should come on when the
gate is closed. Should these be backwards – make the following  changes: From the
MASTER plug – there are five wires going to a terminal strip… Reverse the RED with
the  BLACK -  and –  reverse  the  ORANGE  with  the  WHITE.  To  verify  that  the  wiring
has been changed correctly: Manually move the gate to the mid-way position and plug
the  main  harness  into  the  EMERGENCY  BYPASS  receptacle –  the  gate  should
OPEN.  If  it  closes –  the  RED  and  BLACK  motor  wires  must  be  reversed.  Once  it  is
verified  that  the  EMERGENCY  BYPASS  does  open  the  gate –  then  check  the  limit
switch wiring. Dis-engage the mechanical release and open the gate fully – verify the
OPEN LIMIT led is on. Close the gate fully – verify the CLOSED LIMIT led. If the limits
are backwards – reverse the ORANGE and WHITE limit wires.

8.

Dual Gate Systems: Test dual gate systems individually. Turn program switch #3 ON
(disables SLAVE side of board) and test actuators one at a time using MASTER side
of board only. Confirm proper operation of each actuator. If both test 100% - then test
together by connecting both actuators and turning program switch #3 to the OFF posi-
tion.

9.

EMERGENCY BYPASS: At the bottom left of the board is the EMERGENCY BYPASS
receptacle.  Plugging  the  operator  harness  into  this  receptacle  will  OPEN  the  gate
ONLY! It is intended to open the gate(s) should other methods fail. Note that if the mo-
tor draws more than 15 amps of current the fuse above the receptacle will blow. Also,
the  gate  operator  will  not  stop  by  its  self  at  the  open  position. The  plug  must  be  re-
moved to stop the gate. (This is also a handy way to test that the current consumption
of the motor is within the normal limits)

10.

FIRMWARE: In the upper right area of the board there is a micro-processor that has a
white label on it. This is the “FIRMWARE” of the system. Currently (May 2005) we are
using firmware version V31.00.02. For troubleshooting versions of the firmware earlier
then V31.00.00 consult your original instructions that were included with your system.
Systems  that  are  out  of  warranty  may  be  upgraded  to  newer  version  firmware  for  a
nominal fee.

TROUBLESHOOTING

Содержание 7500ETL

Страница 1: ...Model 7300 INSTALLATION MANUAL APOLLO Gate Operators Inc Model 7500ETL Residential Heavy Duty Commercial Slide Gate Operator 08 18 09 Requires installation of 4 x4 mounting post not supplied...

Страница 2: ...5 Parts Identification 6 Post Installation 7 Operator Installation 8 Chain Chain Bolt Installation 9 Wiring Instructions 10 Internal Limit Adjustment 11 Quick Release Operation 12 Current Sense Adjust...

Страница 3: ...ldren operate or play with gate controls Keep the remote control away from children Always keep people and objects away from the gate NO ONE SHOULD CROSS THE PATH OF THE MOVING GATE Test the gate oper...

Страница 4: ...vent of power outages The battery may be recharged with a trickle charger or by solar energy Electrical battery chargers should have a class 2 transformer rating If a trickle charger is used and a sta...

Страница 5: ...mine the general location of the operator chain brackets and solar panel if used 1 Is there a suitable location for the operator 2 Can the solar panel if used be mounted in an unobstructed area facing...

Страница 6: ...0 Roller Chain 30 feet Master Chain Links 2 each Operator 5 16 Washers Lock Nuts Nuts 8 each 5 16 U Bolts 4 each Chain Bolts with hardware 2 each Base Plate Mounting Hardware 3 8 bolt 2 washers lock w...

Страница 7: ...gidity If you are not sure how deep to set the post contact a local fence installer for a recommendation 1 Position the gate closed 2 Check that there is at least two feet of gate or tail that is not...

Страница 8: ...level and parallel to the gate STEP 2 Bolt the main chassis on to the base plate using the four 3 8 bolts washers lock washers and nuts STEP 3 Assemble chain bracket with 5 16 U bolt hardware to each...

Страница 9: ...lt using the master chain link Do not tighten the chain bolts Note A chain breaking tool may be required to reduce the chain to the proper length STEP 3 Check chain align ment with idler sprockets Tig...

Страница 10: ...tor on the circuit board STEP 1 Determine which direction the gate will open The factory units are plugged into INPUT B for right hand opening as shown in Fig 1 For left hand opening disconnect from I...

Страница 11: ...uminated Limit adjustment for left movement gate moving to the left less travel more travel Limit adjustment for right movement gate moving to the right less travel more travel Step 4 Adjust the corre...

Страница 12: ...12 QUICK RELEASE OPERATION Engaged Engaged Pull handle out and lock by sliding to the right or left to disengage...

Страница 13: ...ould be set before beginning this procedure 1 Press and hold the LED ENABLE button for five seconds and release The STOP LED will blink indicating that the board is in learn mode 3 Cycle gate for 3 4...

Страница 14: ...Indicators Optional Device Input Remote Monitor Outputs and Photo Eye GateLink Connector Microprocessor Timer To Close Dual Gate Delay Current Sensitivity Adjustments Program Switches 835 836 Control...

Страница 15: ...835 836 board Connect the relay wires of the accessory as normal COM to GND NO to SAFETY 14 for a safety device When the gate operator begins opening comes off of the closed limits the MAS terminal wi...

Страница 16: ...eshooting Hold the push button down for five seconds to put the board in program mode RESET Resets the microprocessor Returns processor to last known state Jumpers STOP CIRCUIT JUMPER When the STOP CI...

Страница 17: ...utton released 6 LOCK TYPE For 12V mechanical solenoid locks For 12V magnetic locks 12V for 4 seconds on open cycle 12V when on close limit 7 COAST ENABLE Gate will stop immediately when at Gate will...

Страница 18: ...ion see program switch 5 for options OPEN Open input from a 3 button station see program switch 5 for options GND Supplied Battery Ground GND Supplied Battery Ground FREE EXIT Opens gate if closed sto...

Страница 19: ...or on the Remote Monitor Output Connector block Connect the black wire to the GND connector on the Remote Monitor Output Connector block Red Black Set Program Switch 4 as preferred ON Upon activation...

Страница 20: ...sition Transmitters must match code switches for proper operation If power is taken directly from battery or connected as shown below receiver should be configured for 12VDC Multi Code Digi Code Allst...

Страница 21: ...NGLE GATE 1 2 3 5 ON all others OFF DUAL GATE 1 2 5 ON all others OFF 3 LED ENABLE BUTTON On the right side of the board half way down is the LED ENABLE button Pressing this button once and releasing...

Страница 22: ...the wiring has been changed correctly Manually move the gate to the mid way position and plug the main harness into the EMERGENCY BYPASS receptacle the gate should OPEN If it closes the RED and BLACK...

Страница 23: ...lightning The manufacturer will not be responsible for any labor charges incurred in the removal or replacement of defective parts In case of failure due to defective material or workmanship during t...

Отзывы: